My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP08865
CWCB
>
Water Supply Protection
>
Backfile
>
8001-9000
>
WSP08865
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:49:56 PM
Creation date
10/12/2006 3:19:13 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8220.101.10.B
Description
Colorado River-Water Projects-Glen Canyon Dam/Lake Powell-Glen Canyon Adaptive Management-TWG
Basin
Colorado Mainstem
Water Division
5
Date
6/10/2005
Title
Fiscal Year 2006-Monitoring and Research Work Plan
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
184
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />00509 <br /> <br />34 <br /> <br />e Implications of Experimental vs. Non-Experimental Scenarios: None here, as there is no <br />High-Flow Sediment Experimental treatment proposed. Budget consists only of partial salary <br />support for the GCMRC's Remote-Sensing Coordinator. <br /> <br />Project A.5a. Science Support of All Data Storage witbin Grand Canyon Integrated <br />(Oracle) Database Management System (DASA) - Database Administrator and DASA <br />Coordinator (G. Bennett) <br /> <br />Ie <br /> <br />. ! <br /> <br />FUNDING <br />HISTORY Fiscal year <br /> 2002 2003 2004 2005 2006 <br />Outside GCMRC <br />Science/Labor 100,000 251,000 18,000 15,000 32,500 <br />Logistics Field <br />Support - - - - 0 <br />Project Related <br />Trainin!!/Travel 3,000 1,000 2,000 3,000 3,000 <br />Operations/Supplies 10,000 10,000 5,000 5,000 12,000 <br />GCMRC Salaries 56,000 67,000 80,000 89,000 91,500 <br />Proiect Subtotal - - - - 139,000 <br />DOl Customer <br />Burden (6 to 17%) - - - - 18,105 <br />Project Total 201,000 363,000 128,000 128,000 157,105 <br />% Total <br />Outsourced 50% 69% -14% -12% 21% <br /> <br />Principal Investigators: DASA Coordinator and DBMS administrator (G. Bennett), U.S. <br />Geological Survey (GCMRC) <br /> <br />Statement of Problem: The need for a comprehensive database for maintaining this <br />information was recognized by the National Academy of Sciences in their initial review of the <br />GCES Program in 1987, and reinforced during a second review in 1990. Extensive data and <br />infonnation currently exists in the GCMRC collections relating to resource conditions, quality, <br />and relationships to other resources. Potentially equal amounts of data and information exist <br />within museums, universities, agencies, etc. However, much ofthis information has not becn <br />organized, managed or intcgrated into an analysis of the interrelationship among various <br />resources and dam operations. <br /> <br />e <br /> <br />GCMRC FY2006 Annual Work Plan (Draft, June 10,2005) <br />
The URL can be used to link to this page
Your browser does not support the video tag.