My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP08865
CWCB
>
Water Supply Protection
>
Backfile
>
8001-9000
>
WSP08865
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:49:56 PM
Creation date
10/12/2006 3:19:13 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8220.101.10.B
Description
Colorado River-Water Projects-Glen Canyon Dam/Lake Powell-Glen Canyon Adaptive Management-TWG
Basin
Colorado Mainstem
Water Division
5
Date
6/10/2005
Title
Fiscal Year 2006-Monitoring and Research Work Plan
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
184
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />00504 <br /> <br />24 <br /> <br />\e Expected ProductslDeliverables: <br /> <br />. Monthly web site report <br />· Annual water year open file report <br />· Complete Lake Powell water quality database <br />. Publish and provide on-line access to historical water quality information <br />· Contribution to SCORE report <br /> <br />'. <br /> <br />ie <br /> <br />Integration: During FY 2006, new research on food web dynamics will be initiated through a <br />competitive process. As this effort gets underway, the Integrated Quality of Water program will <br />be evaluated and modified to meet the needs of this new research effort, as well as other existing <br />project. The Lake Powe\1 monitoring program wi\1 be included in these evaluations, as well as <br />any planning that occurs related to future implementation of thermal modification experiments. <br /> <br />Implications of Experimental vs. Non-Experimental Scenarios: None here. <br /> <br />Project A.2. - Ongoing Provisional Monitoring - Downstream Quality-or-Water for <br />Physical, Biological and Chemical Sampling <br /> <br />FUNDING <br />HISTORY* Fiscal year <br /> 2002 2003 2004 2005 2006 <br />Outside GCMRC <br />ScienceILabor 329,000 476,000 614,500 927,500 325,000 <br />Logistics Field <br />Support 40,000 40,000 152,000 160,000 25,000 <br />Project Related <br />Travelffraininl! - - - - 10,000 <br />Operations/Supplies 235,500 13 0,500 142,500 190,000 30,000 <br />GCMRC Salaries 81,000 162,000 195,000 330,000 309,100 <br />Proiect Subtotal - - - - 699,100 <br />DOl Customer <br />Burden (17%) - - - - 118,847 <br />ProJect Total 685,500 808,500 1,104,000** 1,607,500** 817,947 <br />% Total <br />Outsourced -51% -61% -63% -63% 41% <br /> <br />. In earher annual plans and budgets, this project was previously descnbed and budgeted as two separate projects, one relating to Downstream <br />Quality of Water monitoring and the other relating to the monitoring of suspended-sediment nux. The FY 2002-2005, budget totals sho'Wll here <br />renee! the combined sums afcosts from the two projects. respectively, shown in the previous work plans. Combining the two projects is done to <br />beuer integrate the monitoring and the FY 2006 efforts combme the logistical support needed for accomplishing the suspended.sedimem mass <br />nuX. wilh other downstream quality-or-water monitoring. <br />U The FY 2004 & 2005 total project costs renect additional research funding 00 support additional monitoring of the experimental Fluctuating <br />Flows in 2003-2004, & the High-Row tesl conducted in November 2004. <br /> <br />GCMRC FY2006 Annual Work Plan (Draft, June 10,2005) <br />
The URL can be used to link to this page
Your browser does not support the video tag.