My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP08809
CWCB
>
Water Supply Protection
>
Backfile
>
8001-9000
>
WSP08809
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:49:45 PM
Creation date
10/12/2006 3:17:22 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8220.106
Description
Animas-La Plata
State
CO
Basin
San Juan/Dolores
Water Division
7
Date
1/1/1996
Title
Correspondence regarding the Final Biological Opinion - 1996
Water Supply Pro - Doc Type
Biological Opinion
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />, <br /> <br />MAYNES,BRADFORD&SHPS <br />. I , . ~ <br />\ <br />i <br />I <br /> <br />Paae 8, raJe 1.: The lable should also include avera2C flow years. not just the lowest and <br />hiahe t flow epnditions. The flDWS listed would be present nnly very limited times and may not <br />be . OItADt,tp the specie. l'~scnt. The intUIICtion of flow and habitat dynamic. are currently <br />beill' tudiedln the San Juan River Seven Year Research Program and should be DOled. <br />. I . <br />PII.e Po Wati=r fluJlty NCCIOIl 3re1 para,: Thc water quality report for the Animas La Plate <br />Proj Envirqnmental Statemellt shows that selenium levels in the San Juan River will decrease <br />with e full ptojm This repon was completed after completion of the Biological Assessment <br />and it newer fcsults should be included in the Biological Opinion. <br /> <br />. ht ~.: It is comet that allieS! flows have not yet been provided, however, it is <br />t that Ibe requested flows have not been synehronous with the Animas River peale. The <br />Ani River .u.~a1ly haa tWO distinct peale, and can have lIS many lIS three peaks during runoff. <br />Seve Df th. test flow years have spanned tho peak flow period or the Animas River. It has' <br />beOn ~d will be very difficult if not nearly impossible to OAactly "match" the Animas IUver <br />pelt. h\e objecttve of the Biolol}' Committee in specil'yinl release pattenlS has been to match <br />the." Imas River peak as closely as possible. To that extent, the tlows have matched the Animas <br />River in'se~era1 years, <br /> <br />ID:303-247-SS27 <br /> <br />FEB 01'96 <br /> <br />15:44 No.019 P.05 <br />.._._-.-w..:,. 1._ <br /> <br /> <br />Pap 9,4th lIara.: The inability to store 300.000 AF of water under full ha..in development:96 <br />'l6 Of t lime would indicate that the Animas La Plata Project wlU not be able to deplele more <br />than S ,100 AF in IIDY year. This further lIlagestl lballbe RPA requirement 0000,000 AP 96'1(, <br />of the . il1lnaitainable and in reality the Project will be limlfl:d to 57.100 AF DCllUUlUaJ <br />deplet n. If tbls Is tbe ease, that should be slaled inthc RPA and notlhat 300,000 AF is <br />avlinll Ie 96%Qf tbe time. <br /> <br />Thank you for~ opponullity to comment. <br /> <br />S' y, <br />MIL ECoLoGICAL CONSULTANTS, INC. <br /> <br />~04II/L <br />Willi J. MiI"'Ph:O. <br />Semor Aquatiq &olociat <br /> <br /> <br />; . <br /> <br />ec: Ja ce She I. Maynes Bradford Shipp8 IIDd Sheflel <br />Sco" cBlroy Creone Meyer & McBlfOY <br /> <br />, <br />~ <br /> <br />3 <br /> <br />. <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />TOTA... P.04 <br />
The URL can be used to link to this page
Your browser does not support the video tag.