Laserfiche WebLink
<br />SPINNEY MOUNTAIN RESERVOIR FEASIBILITY STUDY <br /> <br />WATER SUPPLY YIELD HYDROLOGY <br /> <br />I. INTRODUCTION <br /> <br />II. HOMES TAKE PROJECT <br /> <br />Description <br />Basic Data <br />Yield Analysis <br />Prediction Functions - Homestake Division <br />Comparison with Original Bechtel Estimates <br />Prediction Functions - Eagle-Arkansas Division <br />Summary <br /> <br />III. SOUTH PARK IRRIGATION RIGHTS <br /> <br />General <br />Augustine Transfer <br />Evaluating the Effect of Priority Administration <br />Empirical CallOut Function <br />Double Duration CallOut Function <br />Yield Analysis <br />Summary <br /> <br />IV. OTHER SOURCES <br /> <br />Last Chance Ditch <br />Burlington-Wellington Ditch System <br />South Platte River Direct Flow Right <br />Spinney Reservoir Storage Appropriation <br />Burroughs Estate Ranch <br />Twin Lakes <br />