Title
26th Annual Report on the Statuts of the Colorado River Storage Project
Water Supply Pro - Doc Type
Annual Report
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> <br />Construction <br /> <br />The major construction activities in the <br />Colorado River Storage Project area and the <br />Upper Colorado Region in fiscal year 1 982 are <br />on the Bonneville Unit, Central Utah Project, <br />Dolores Project, Dallas Creek Project, and <br />Colorado River Basin Salinity Control Project. <br />Minor construction or rehabilitation was also in <br />progress on the Jensen Unit and Vernal Unit <br />ot the Central Utah Project; Glen Cenyon <br />Storage Unit, Flaming Gorge Storage Unit, <br />Wayne N. Aspinall Storage Unit of the <br />Colorado River Storage Project; Seedskadee <br />Project. and Lyman Project. <br /> <br />Central Utah Project: Bonneville Unit _ <br />Work on the following features was completed <br />in fiscal year 1982: Currant Creek Dam; <br />Jordan Aqueduct Reach 3; Starvation Dam, <br />remedial grouting; Stillwater Tunnel inlet <br />repairs; Upper Stillwater Field Station; explora- <br />tory drilling, Wasatch Aqueduct Tunnel portals; <br />buildings, roads, and utilities, Strawberry Bay <br />Campgrounds; roads, buildings, and utilities, <br />Soldier Creek and Aspen Grove campgrounds, <br />Strawberry Reservoir. Work continued on the <br />following in 1982: Vat Tunnel; Vat DiverSion <br />Dam, and West Fork Pipeline; Jordan Aque- <br />duct flow control structures and Reach 3 <br />completion; Hades and Rhodes Tunnel and <br />appurtenant structures; Pioneer Canal, <br /> <br />4 <br /> <br /> <br />Inspector Stan Schow during Upper Stillwater work <br /> <br />Duchesne River Canal rehabilitation; Rock <br />Creek Road repair and paving; and exploratory <br />drilling, Jordanelle Dam and Reservoir site. A <br />contracl for completion ot Stillwater Tunnel <br />was awarded and is continuing. <br /> <br />Contracts were awarded for the following <br />work: Utah Projects Complex; Upper Stillwater <br />Dam foundation excavation; exploratory <br />drilling, Jordanelle Damsite; Strawberry Tunnel <br />inlet rehabilitation; exploratory drilling, Fitth <br />Water Reservoir Area; sand and aggregate <br />production for Upper Stillwater Tunnel and <br />appurtenant structures, <br /> <br />Jensen Unit - Work on the Red Fleet Camp. <br />ground was accepted as substantially <br />complete in June 1982. Work continued on the <br />Tyzack Pumping Plant and Aqueduct. Concrete <br />was placed in the pumping plant and the <br />discharge manifolds were installed. Preten. <br />sioned concrete pipe for the aqueduct was <br />installed during the fiscal year. The work is <br />about 65 percent complete. <br /> <br />Vernal Unit - A contract for modifications to <br />Vernal Pilot Drain was awarded and about 95 <br />percent complete by the end of the fiscal year. <br /> <br />Dolores Project: Work continued on McPhee <br />Dam, the major feature of the Dolores Project. <br />Construction progress is still ahead of <br />schedule. <br /> <br /> <br />Workmen prepare for pouring concrete at Vat Diversion. <br /> <br />The contractor for McPhee Dam and the <br />Great Cut Dike continued work on the cut-oft <br />trench, grouting, excavation, and embankment, <br />selective level outlet works, river outlet works, <br />spillways, and stilling basins. The river was <br />diverted in April 1982. About 73 percent ot the <br />work was complete by the end ot the tiscal <br />year. A contract for upgrading and paving the <br />McPhee Access Road and surfacing the <br />Dolores Field Station was completed on <br />December 7,1981. A contract for $11,686,890 <br />was awarded for Dolores Tunnel and Canal in <br />April 1982. By the end of fiscal year 1 982, <br />about 25 percent of the work was complete. A <br />contract was also awarded in May 1982 for <br />Calt Creek and Plateau Creek bridges. By the <br />end ot tiscal year 1982, about 43 percent of <br />the work was complete. <br /> <br />Dallas Creek Project: Work continued on <br />Ridgway Dam of the Dallas Creek Project. <br />During the past year the contractor on <br />Ridgway Dam, Stage 1, continued work on the <br />dam, completing the contract July 27, 1982. A <br />contract for completion of the Ridgway Dam, <br />Stage 2, was awarded in late fiscal year 1982. <br /> <br />Colorado River Salinity Control Program: <br />Paradox Valley Unit - A contract for <br />$190,060 was awarded in August 1982 for <br />additional wells and brine pipeline extension. <br />