My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP08804
CWCB
>
Water Supply Protection
>
Backfile
>
8001-9000
>
WSP08804
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:49:42 PM
Creation date
10/12/2006 3:17:04 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8220.100.40
Description
CRSP
Basin
Colorado Mainstem
Date
6/30/1982
Author
USDOI
Title
26th Annual Report on the Statuts of the Colorado River Storage Project
Water Supply Pro - Doc Type
Annual Report
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> <br />Fiscal Year 1982 Highlights <br /> <br /> <br />ViSitor views Reclamation's history in pictures. <br /> <br />Water year. The Upper Colorado River Basin <br />yielded 12,654,000 acre.feet during this fiscal <br />year; 111 percent of the long-time average, <br />over twice what it was last year at this time. <br />The heavy runoff came late and resulted in <br />significantly higher average levels at some <br />reservoirs, such as Flaming Gorge, which was <br />143 percent of average. <br /> <br />Lyman Project: The operation and mainte. <br />nance responsibility for Meeks Cabin Dam, <br />Stateline Dam and the appurtenant irrigation <br />works of the Lyman Project were transferred <br />to the Bridger Valley Wafer ConseNancy <br />District on May 1, 1982. <br /> <br />Dallas Creek Project: The contract for Stage <br />I of I;)idgway Dam was completed and a <br />contract for the completion of the dam was <br />awarded. <br /> <br />Dolores Project: Construction of McPhee <br />Dam continued and is approximately 73 <br />percent complete. A contract for the construc- <br />tion of the Dolores Tunnel and Canal was <br />awarded. <br /> <br />2 <br /> <br /> <br />I <br /> <br />- <br /> <br />--, <br /> <br />I <br /> <br />L... <br /> <br />.~ <br />~ <br />'~'J <br /> <br />Reclamation officials at 1982 Sail Lake NWRA convention <br /> <br />Animas.La Plata Project: Construction pre. <br />requisites are essentially complete under the <br />Advance Planning program. <br /> <br />Central Utah Projact: Bonneville Unit - On <br />the Bonneville Unit the contract for the Currant <br />Creek Pipeline was compiefed. Jordan Aque- <br />duct Reach III is essentially complete. New <br />major contract awards included Stillwater <br />Tunnel Completion in February, foundation for <br />Upper Stillwater Dam in November 1981, Utah <br />Projects Office Complex in July and Trailer. <br />house Replacements for the Duchesne Camp <br />In September. <br />
The URL can be used to link to this page
Your browser does not support the video tag.