My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP08772
CWCB
>
Water Supply Protection
>
Backfile
>
8001-9000
>
WSP08772
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:49:35 PM
Creation date
10/12/2006 3:15:22 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8220.100.25
Description
CRSP
Basin
Colorado Mainstem
Date
10/1/1953
Author
USDOI/BOR
Title
Supplemental Report on Colorado River Storage Project and Participating Projects, Upper Colorado River Basin, October 1953
Water Supply Pro - Doc Type
Publication
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />"..... <br /> <br />. <br /> <br />.. <br /> <br />" <br /> <br />. <br /> <br />.' <br /> <br />" <br /> <br /> <br />D~~~n,!~ ~' <br />roEC 23 I'''~' <br /> <br />GOVERNOR'S OffiCE <br /> <br />UNITED STATES <br />DEPARTMENT OF THE INTERIOR <br />',O:l!fiee ofthe'SecreMry <br />,'," Washin!g:ton25,D.C. <br /> <br />Deoember 10, 1953 <br /> <br />", <br /> <br />",-, <br /> <br />, '''''PIi'ro1ighl ,B'urea1iClf the Budget' <br /> <br />'".: .,~"C ,;, ~. <br /> <br />MW dear Mt, President: <br /> <br />On December 4, 1952, m7' predecessor in office submitted a <br />report on a proposed plan for the development and utilization of a <br />portion of the wcter resources of the Upper Colorado River Basin by <br />construction of the Colorado River S~orage Project and Participating <br />Projects. By lette:r of January':;n; 195:3 "BUdget Direotor Dodge asked <br />that I review this report to determine whether it conforms to m7 pro- <br />gram in ternw of present policies and whether any modification:or re~ <br />vision should be made. <br /> <br />i.tter review of the report and re-analysis of the recommended <br />units and projects by the Commissioner of Reclamation at m7 request, I <br />submit herewith m7 revised report on the Colorado River Storags,Project, <br />and Participating Projects, which supersedes the previous report of <br />December 4, 1952., <br /> <br />A proposed report on this projeot was transmitted to the <br />affected States and to the Secretary of the Army as required by the <br />Flood Control Act of December 22, 1944 (58 Stat. 887), and to other <br />Federal Agencies in aocordance with Inter-Agency agreements, and,copies <br />of all the comments are included with the report. The comments of the <br />heads of the Agenoies exercising administration over the wildlife re- <br />souroes of the States in which project works would be located are also <br />included. <br /> <br />It should be noted that m7 revised report approves the <br />Echo Park Dam and the Split Mountain Dam, both of which would be con- <br />struoted within the Dinosaur National Monument. Because of the oon- <br />flioting interests which have arizen in connection with these darns, <br />r requested the Under Secretary to undertake a personal investiga- <br />tion of these proposed dam sites, the extent to whioh Dinosaur National <br />Monument would be modified by their oonstruction, and the possibility <br />of alternative dam sites. r am attaching a copy of his memorandum on <br />this sl1bJe@'iJ. <br /> <br />The Department of the Interior in submitting this report <br />anticipates modification of its opinion on any individual projects <br />
The URL can be used to link to this page
Your browser does not support the video tag.