My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP08734
CWCB
>
Water Supply Protection
>
Backfile
>
8001-9000
>
WSP08734
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:49:27 PM
Creation date
10/12/2006 3:14:21 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8210.430
Description
Colorado River Basin Organizations-Entities - Gunnison - UVWUA - AB Lateral
State
CO
Basin
Colorado Mainstem
Water Division
5
Date
7/1/2000
Author
DOI
Title
AB Lateral Hydropower Project - Supplemental Environmental Impact Report - Appendix A - Wetlands Mitigation Plan
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />'Hp ., q fj <br />'-'- .:.. . 0 'Wetland Mitigation <br /> <br />A- 20 <br /> <br />A final report would be prepared upon completion of fi ve years of monitoring. ME!' s <br />sediment routing model predicted that the great majority of stream adjustment will occur <br />within the project's first 3 to 5 years of operations (The analysis was included in the <br />Sponsors' Response to Public Comments, filed with the Corps in December, 1995). <br />After the initial few years, the stream should have largely adjusted to project flows, and <br />project effects should diminish greatly. Sponsors therefore propose that the need for <br />continued channel monitoring be reviewed after the project's fifth year of operation. If <br />little change in channel configuration has occurred in the last few years of monitoring, <br />then monitoring frequency, or the number of sites to observe, may decrease. Morphology <br />impacts will be compared with baseline, pre-project data and predictions. The need for <br />any supplemental mitigation measures will be reviewed. Morphology results will be <br />coordinated with and used in overall impact assessment in the 5-year wetlands study and <br />reports, as well as annual monitoring of stabilized sites for maintenance needs. <br /> <br />AB Laterai P1ydropower Project <br /> <br />July 2000 <br /> <br />, <br /> <br />. <br /> <br />p <br /> <br />I <br />j <br />..~ <br />~iA <br />' " <br />
The URL can be used to link to this page
Your browser does not support the video tag.