My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP08734
CWCB
>
Water Supply Protection
>
Backfile
>
8001-9000
>
WSP08734
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:49:27 PM
Creation date
10/12/2006 3:14:21 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8210.430
Description
Colorado River Basin Organizations-Entities - Gunnison - UVWUA - AB Lateral
State
CO
Basin
Colorado Mainstem
Water Division
5
Date
7/1/2000
Author
DOI
Title
AB Lateral Hydropower Project - Supplemental Environmental Impact Report - Appendix A - Wetlands Mitigation Plan
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />M1SCl7 <br /> <br />Wetland Mitigation <br /> <br />A- 8 <br /> <br />related effects such as site access. Indirect impacts include those not associated with <br />placement of fill, but that are expected to occur as a result of overall operation of the <br />project. The latter category includes the erosive effects of high flows, and impacts of <br />channel adjustments associated with the higher flows. <br /> <br />Table 1 below summarizes anticipated impacts associated with the project. <br /> <br />Table 1 <br />Summary of Anticipated Project Effects on Wetlands <br /> <br /> Alternative E-1 Alternative E-2 Alternative E-3 <br /> Short- Long- Short- Long- Short- Long- <br />Activity term term term term term term <br /> effect effect effect effect effect effect <br /> (acres) (acres (acres) (acres) (acres) (acres) <br />1. Direct Impacts <br />Stabilization ( 1.0) (1.0) (1.0) <br />footprint <br />Monitor sites (0.4) (0.4) (0.4) <br />(potential) <br />Access (0.1) 0 (0.1) 0 (0.1) <br />II. Indirect Impacts <br />Widening (56.1) 0 (45.6) 0 (36.0) 0 <br />Enhanced diversity 107.1 88.7 70.3 <br />Diminished diversity (15.0) (15.0) (15.0) <br />Annual emergents (a) (a) (a) <br />Backwaters, recharl!e (b) (b) (b) <br />Totall!ain (loss) +90.7 +72.3 +54.9 <br /> <br /> <br />Notes: <br />[a]. Annual emergents on widened channel bed are not included in total. See below. <br />[b]. Backwaters and recharge of off-channel areas are not included in total. See <br />below. <br /> <br />"Widening" represents the total losses that would occur for long-term channel <br />adjustment. Wetlands studies completed by Sponsors have indicated that all of these <br />losses should be replaced through a natural resetting of wetlands with the new channel <br />margins. The net, long-term impact is estimated to be zero. Consultants believe this <br />because post-project growing-season hydrology is equal to or better that the existing <br />hydrology, and sufficient hydric soils and seeds sources for wetland establishment are <br />plentiful. Nonetheless, these short-term impacts will be mitigated, as discussed below. <br /> <br />"Enhanced and diminished diversity" reflect the anticipated benefit of additional project- <br />related water in the growing season. Most of the project's hydrologic input to the system <br />will occur during the winter. This water will have little in the way of positive or negative <br /> <br />AB Lateral Hydropower Project <br /> <br />JUly 2000 <br /> <br />. <br />i <br />~ <br />-}, <br /> <br />i <br />./ <br /> <br />J, <br /> <br />. <br />i '~'I <br /><~:,,,~j <br />.,.ir...lA" <br />-M"','>':;""~~:'~!,t.,_ <br />
The URL can be used to link to this page
Your browser does not support the video tag.