My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP08733
CWCB
>
Water Supply Protection
>
Backfile
>
8001-9000
>
WSP08733
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:49:27 PM
Creation date
10/12/2006 3:14:15 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8141
Description
Fryingpan-Arkansas Project
State
CO
Basin
Arkansas
Water Division
5
Date
3/7/1960
Author
Acting Sec of Interi
Title
Letter from Acting Secretary of the Interior transmitting a Report and Findings on Ruedi Dam and Reservoir Colo Pursuant to the Federal Reclamation Laws
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
177
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />28 <br /> <br />3719 <br /> <br />RUEDl DAM AND RESERVOIR, COLO. <br /> <br />area is timber or grnzinl/; land. Cle!1ring of !1bout 600 acres of medium <br />timber will be necessary. It will be necessary also to relocate !1pprOXI- <br />m!1l.ely 71/~ miles of two-lane, gmvel-surfaced, State Highw!1Y No. <br />104 which now traverses the reservoir area and a like mileage of <br />. telephone line. <br />The nearest mil head is a branch line of the Denver & Rio Grande <br />'Western Railroad at, Basalt, Colo., slightly more than 14 miles from <br />the damsite vi!1 State Highway 104. The nearest source of elect,ric <br />power is the Public Serdce Co. of Colorado's 115-kilovolt tmnsmission <br />line about 1miJe !1way. <br />There are no adequate living quarters near the reservoir site for <br />construction personnal. The cost estimate provides for adequate <br />housing. Most of these units will be temporary type for use during <br />construction. One will be permanent t.ype so us to provide continued <br />housing for a dam tender after completion of construction. <br /> <br />Oosts <br />The eost. l?-stimate for Ruedi Dam and Re....o:;ervoir is of reconnaissance <br />grade find is based OIl construction prices as of J annary 1959. A <br />,;SlIInmary of the estimate follows: <br /> <br />, <br /> <br />ldt.'?ttified. fJ,'operty and amount <br />Land nod rights_____ _____________ - ---- - ---------- - -- ---- -------- <br />Relocnti1ms _ _____ _ ______u ____ ____ __ ___ ______ -- ---- -------- ---- <br />Clenri ng lands _ _______________________ .---- ------------------ --- <br />Dam, ontlet works, and splllway__________________________________ <br />General property and service facilltieSl____________________________ <br />Investig'lltiun8, engineering, nnd other C08t:L______________________ <br />Recrea tion facili ties_ ____________ -------------------------------- <br /> <br />$185.000 <br />300.000 <br />150. 000 <br />9,fi50,000 <br />33G.000 <br />2,095,000 <br />55,000 <br /> <br />Estimated project cost_____________________________________ 12,831,000 <br />The operating principles specify that Ruedi Dam and Reservoir <br />must be in operadon before diversions of water are made to the enstern <br />slope by the Frying-pan-Arkansas project. As scheduled in the con- <br />struction program for the Fryingpan-Arkansas project, the total con- <br />struction period covers 6 years. The first year would be devoted <br />mainly to preconstruction activity, the following 4 years to active con- <br />stnlCtlon of the dam and reservoir, and the sixth year to minor work of <br />'completion. Construction funds are scheduled as follows: <br /> <br />Fiscal year: AmOURI Fiscnl yenr-Con. AmouRI <br />100~___________________ $500.000 1005__________________ $3.000.~) <br />1063___________________ 3.350.000 1000__________________ 2.040.000 <br />1064___________________ 3.680.000 100T__________________ 255.000 <br />Estimated annual operation, maintenance, fwd replacement costs <br />total $19,700, eonslst.inF' of $9,200 on the dam Hnd reservoir llnd <br />$10,500 on recreation tacilities. The last sum includes $7,500 for <br />. administrat.ion, operation, and maintenn.nce and $3,000 for replace- <br />ment. The construction costs, interest during const.ruct.ion a.nd oper- <br />. ation, mainte1utnces, and replncement are subject to allocation be- <br />tween the Fryingptln-Arkanotls project. and western-slope uses of the <br />reservoir. <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.