<br />Valley to supply the pumping station under 4.d.
<br />
<br />Dam. Plan E includes:
<br />
<br />d. A 300 mgd pumping station in Homestake Valley located at
<br />the southern terminus of the pipeline in 4-b. Gravity flow from
<br />Cross, Fall and Peterson Creeks would be pumped directly into
<br />Homestake Reservoir through the pipeline described under 4-e.
<br />Pumping head would be 1,300 feet. As no storage is provided
<br />under this plan, the pumping rates would necessarily vary from
<br />20 to 300 million gallons per day (mgd) to match stream runoff
<br />rates and permit direct pumping to Homestake Reservoir. Power
<br />demand charges could be significant because of poor load factor
<br />under these diversion conditions, It is also improbable that com-
<br />plete diversion of allocated waters could be accomplished.
<br />
<br />a. A tunnel from Homestake Valley, beginning near the center
<br />of Section 30, Township 6 South, Range 80 West, extending
<br />northwesterly 24,000 feet, passing beneath Fall Creek and Peter-
<br />son Creek and terminating below Cross Creek Valley at elevation
<br />9,100. Riser shafts and diversion facilities would be provided at
<br />Fall, Cross, and Peterson Creeks, The diversion point on Cross
<br />Creek would be downstream of the mouths of West and East
<br />Cross Creeks and would permit all diversion from Cross Creek to
<br />be made at one location.
<br />
<br />I
<br />
<br />I
<br />I
<br />I
<br />
<br />e. A 78 inch pipeline beginning at the pumping station and
<br />extending in a southwesterly direction up Homestake Valley
<br />12,500 feet, thence northwesterly 4,500 feet and connecting to
<br />the northern terminus of the Fancy-French conduit.
<br />
<br />b. A 78 inch gravity pipeline connecting at the downstream
<br />portal of the tunnel in 5-a, and extending 11,000 feet southerly
<br />to the reservoir in 5-d.
<br />
<br />I
<br />
<br />f. A 54 to 60 inch pipeline commencing near the inlet of the
<br />Missouri Tunnel and paralleling the existing Fancy-French grav-
<br />ity conduit 10,500 feet in a northerly direction and connecting
<br />to the pumped water pipeline under 4-1'1.
<br />
<br />c, A diversion structure on the Eagle River near the southeast
<br />corner of Section 4, Township 7 South, Range 80 West. From
<br />the diversion structure, a 48 inch gravity pipeline would extend
<br />12,500 feet westerly to a point upstream of the dam in 5-d.
<br />These facilities would divert the Cities allocations under the
<br />Eagle-Arkansas Division of the Homestake Decrees.
<br />
<br />I
<br />
<br />I
<br />I
<br />
<br />I
<br />
<br />Plan E is similar to Plan D, except that the water is stored in a
<br />new reservoir before it is pumped to Homestake Reservoir. Con-
<br />struction of the new dam and reservoir would require an agree-
<br />ment with the CRWCD for use or purchase of prior filings for
<br />the Iron Mountain Dam and Reservoir under the Red Cliff Project.
<br />The actual dam s;te under the Red Cliff Project is in Section 30,
<br />Township 6 South, Range 80 West as described under Plan F.
<br />Under Plan E, the dam site would be moved to Section 6,
<br />Township 7 South, Range 80 West and designated the Red Cliff
<br />
<br />d. Red Cliff Dam on Homestake Creek in the northeast quarter
<br />of Section 6, Township 7 South, Range 80 West, with crest
<br />elevation 9,010, Red Cliff Reservoir impounded by the dam would
<br />extend through Sections 6 and 7, Township 7 South, Range 80
<br />West and into Sections 12 and 13, Township 7 South, Range 81
<br />West. . Reservoir water surface would be elevation 9,000 and
<br />storage volume 55,000 acre feet, Construction of the reservoir
<br />would require the construction of 3.4 miles of new road along
<br />the shore line of the new reservoir for access to the Homestake
<br />Valley.
<br />
<br />g. A pipeline and other facilities to collect Eagle-Arkansas
<br />Division water as described under l-f.
<br />
<br />5. Plan E - Tunnel, Reservoir, Pumping, and Pipeline
<br />
<br />I
<br />I ,'~
<br />, .
<br />"""
<br />"""
<br />10
<br />
<br />e, A 42 mgd pumping station In Homestake Valley constructed
<br />immediately downstream from Red Cliff Dam to pump water from
<br />Red Cliff Reservoir to Homestake Reservoir through the pipeline
<br />under 5-f.
<br />