My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP08712
CWCB
>
Water Supply Protection
>
Backfile
>
8001-9000
>
WSP08712
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:49:21 PM
Creation date
10/12/2006 3:10:36 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8149.700
Description
Miscellaneous Small Projects and Project Studies - Homestake Project
State
CO
Basin
Arkansas
Water Division
2
Date
4/25/1974
Author
Black and Veatch
Title
Environmental Impact Report - Homestake Water Collection System Extension for Aurora and Colorado Springs with related documents Volume I
Water Supply Pro - Doc Type
EIS
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
169
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />(2) Clearance of 497 acres of forest cover and other vegetation <br />for project components. resulting in habitat loss and some animal <br />kill. <br /> <br />(14) Displacement and destruction of an indetermin~ number <br />of fish and other wildlife during the construction peri. <br />W <br /> <br />(15) Increased noise level due to blasting and tunnelili'g during <br />the construction period. <br /> <br />(3) Inundation of Homestake, Hornsilver, and Blodgett Camp- <br />grounds for the Iron Mountain Reservoir, resulting in the loss of <br />24 camping units. <br /> <br />(16) Increased level of dust in the air due to construction <br />activities. <br /> <br />(4) Reduction of 275 acres of privately owned lands within the <br />Project Area, primarily for reservoir construction. <br /> <br />(17) Increased potential for forest fires due to construction <br />activity. <br /> <br />(5) Reduction of 288 acres of wet meadowlands due to reser- <br />vOIr construction on Homestake Creek and water diversion on <br />Fall and Cross Creeks, resulting in habitat destruction and some <br />loss of indigenous, marsh wildlife. <br /> <br />(18) Increased generation of litter during the construction per- <br />iod. <br /> <br />(6) I nundation of 6,2 miles of Homestake Creek due to reser- <br />voir construction. <br /> <br />( 19) I ncreased pressure for community services (education, <br />police, utilities, etc.) in the commu nities of Minturn, Red Cliff, <br />Gilman. and Vail during the construction period, followed by a <br />surplus of facilities and skilled services when construction is <br />completed. <br /> <br />(7) Reduction of 41,030 acre-feet of water per annum on the <br />western slope. <br /> <br />(8) Reduction in downstream flow along 26.4 miles of sustain- <br />ed streambeds in the Project Area and the Eagle River adjacent <br />to the Project Area, <br /> <br />(20) Increased potential for rapid urbanization and increased <br />population growth in the Cities of Aurora and Colorado Springs <br />with attendant socio-economic problems and costs. <br /> <br />(9) I ncrease in salinity levels on the Lower Colorado River of 3 <br />ppm due to reduction in downstream flow. <br /> <br />(21) Power generation of an additional 109,000,000 kWh per <br />year for the operation of required pumping. Generation <br />would probably be by a coal-fired steam plant which would <br />result in increased air polluation near the generating site, in- <br />creased alteration of land features in the area from which the <br />coal is mined. and possible tightening of the supply of electrical <br />energy in the region. <br /> <br />(10) Increased traffic along Highway 24 and along access roads <br />into the Project Area during the construction period due to an <br />influx of approximately 500 construction workers. <br /> <br />(11) Relocation of 2,7 mi les of Highway 24. <br /> <br />The Environmental Effects Evaluation Summary (Table 21) classi- <br />fies the magnitude of impacts for each alternative plan on a 5 <br />point scale: major adverse, minor adverse, negligible. minor bene- <br />ficial, major beneficial. This evaluation summary shows that <br />implementation of Plan A would cause more major adverse <br /> <br />(12) I nstallation of 2,5 miles of new power transmission lines. <br /> <br />(13) Installation of 2.4 miles of new telephone line. <br /> <br />8 <br /> <br />I <br />I <br /> <br />I <br /> <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />I <br />I <br /> <br />I <br />I <br />
The URL can be used to link to this page
Your browser does not support the video tag.