My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP08712
CWCB
>
Water Supply Protection
>
Backfile
>
8001-9000
>
WSP08712
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:49:21 PM
Creation date
10/12/2006 3:10:36 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8149.700
Description
Miscellaneous Small Projects and Project Studies - Homestake Project
State
CO
Basin
Arkansas
Water Division
2
Date
4/25/1974
Author
Black and Veatch
Title
Environmental Impact Report - Homestake Water Collection System Extension for Aurora and Colorado Springs with related documents Volume I
Water Supply Pro - Doc Type
EIS
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
169
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />I <br />I <br /> <br />, <br />mimid, and possible tightening Of the supply of electrical energy <br />. <br />in the region. <br /> <br />(11) Displacement and destruction of an indeterminate number <br />of fish and other wildlife during the construction period. <br /> <br />Plan E - Tunnel. Reservoir. Pumping, and Pipeline <br /> <br />(12) Increased noise level due to blasting and tunneling during <br />the construction period. <br /> <br />(1) Destruction of 747 acres of elk and deer winter game range <br />along Homestake Creek for construction of project components. <br /> <br />(13) Increased level of dust in the air due to construction <br />activities. <br /> <br />I <br />I <br /> <br />(2) Clearance of 305 acres of forest cover and other vegetation <br />for project components, resulting in habitat loss and some animal <br />kill. <br /> <br />(14) Increased potential for forest fires due to construction <br />activity. <br /> <br />(3) Reduction of 168 acres of privately owned lands within the <br />Project Area, primarily for reservoir construction. <br /> <br />(15) Increased generation of litter during the construction <br />period. <br /> <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />(4) Reduction of 135 acres of wet meadowlands due to reser- <br />voir construction on Homestake Creek and water diversion on <br />Fall and Cross Creeks, resulting in habitat destruction and some <br />loss of indigenous, marsh wildlife. <br /> <br />(16) Increased pressure for community services (education. <br />police, utilities, etc,) in the communities of Minturn. Red Cliff, <br />Gilman, and Vail during the construction period, followed by a <br />surplus of facilities and skilled services when construction is <br />completed. <br /> <br />(5) Inundation of 3.4 miles of Homestake Creek due to reser- <br />voir construction, <br /> <br />(17) Increased potential for rapid urbanization and increased <br />population growth in the Cities of Aurora and Colorado Springs <br />with attendant socio-economic problems and costs. <br /> <br />(61 Reduction of 41,030 acre-feet of water per annum on the <br />western slope. <br /> <br />I <br /> <br />(~ Increase in salinity levels on the Lower Colorado River of 3 <br />~ due to reduction in downstream flow. <br />~ <br />m I ncreased traffic along Highway 24 and along access roads <br />into the Project Area during the construction period due to an <br />influx of approximately 500 construction workers, <br /> <br />(18) Power generation of an additional 101.000.000 kWh per <br />year for the operation of required pumping. Generation <br />wou Id probably be by a coal-fired steam plant which wou Id <br />result in increased air pollution near the generating site, increased <br />alteration of land features in the area from which the coal is <br />mined, and possible tightening of the supply of electrical energy <br />in the region. <br /> <br />(7) Reduction in downstream flow along 23 miles of sustained <br />streambeds in the Project Area and the Eagle River adjacent to <br />the Project Area. <br /> <br />Plan F - Tunnels. Pipeline. Reservoir, and Pumping <br /> <br />I <br /> <br />(10) Installation of 0.6 miles of new power transmission lines. <br /> <br />(1) Destruction of 743 acres of elk and deer winter game range <br />along Homestake Creek for construction of project components. <br /> <br />5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.