Laserfiche WebLink
<br />- <br /> <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />.~ <br /> <br />(5). . I ncrease in salinity levels on the Lower Colorado River of 3 <br />ppm due to reduction in downstream flow. <br /> <br />Plan C - Tunnels and Pipeline <br /> <br />(6) I ncreased traffic along Highway 24 and along access roads <br />into the Project Area during the construction period due to an <br />influx of approximately 200 construction workers. <br /> <br />(1) Clearance of 93 acres of forest cover and other vegetation <br />for the project components, resulting in habitat loss and some <br />animal kill. <br /> <br />(7) Displacement and destruction of an indeterminate number <br />of fish and other wildlife during the construction period. <br /> <br />(2) Reduction of 241 acres of wet meadowlands below diver- <br />sion points on Fall and Cross Creeks, resulting in habitat destruc- <br />tion and the possible loss of some indigenous, marsh wildlife. <br /> <br />(8) I ncreased noise level due to blasting and tunneling during <br />the construction period, <br /> <br />(3) Reduction of 35.530 acre-feet of water per annum on the <br />western slope. <br /> <br />(9) I ncreased level of dust in the air due to construction activi- <br />ties. <br /> <br />(4) Reduction in downstream flow along 34.6 miles of sustain- <br />ed streambeds in the Project Area and the Eagle River adjacent <br />to the Project Area. <br /> <br />(10) Increased potential for forest fires due to construction <br />activity, <br /> <br />I <br /> <br />( 11) I ncreased generation of litter during the construction <br />period. <br /> <br />(5) Increase in salinity levels on the Lower Colorado River of 3 <br />ppm due to reduction in downstream flow. <br /> <br />I <br /> <br />( 12) I ncreased pressure for community services (education, <br />police, utilities, etc.) in the communities of Minturn. Red Cliff. <br />Gilman. and Vail during the construction period, followed by a <br />surplus of facilities and skilled services when construction is <br />completed. <br /> <br />(6) Increased traffic along Highway 24 and along access roads <br />into the Project Area during the construction period due to an <br />influx of approximately 300 construction workers, <br /> <br />I <br /> <br />(7) Displacement and destruction of an indeterminate number <br />of fish and other wildlife during the construction period, <br /> <br />I <br />I <br /> <br />(13) I ncreased potential for rapid urbanization and increased <br />population growth in the Cities of Aurora and Colorado Springs <br />with attendant socio-economic problems and costs, <br />--' <br />cn4) Power generation of an additional 21.000.000 kWh per <br />~ar for the operation of required pumping. Generation <br />would probably be by a coal-fired steam plant which would <br />result in increased air pollution near the generating site. increased <br />alteration of land features in the area from which the coal is <br />mined and possible tightening of the supply of electrical energy <br />in the region, <br /> <br />(8) Increased noise level due to blasting and tunneling during <br />the construction period. <br /> <br />I <br />II <br /> <br />(9) Increased level of dust in the air due to construction activi- <br />ties, <br /> <br />(10) Increased potential for forest fires due to construction <br />activity. <br /> <br />( 11) I ncreased generation of litter during the construction <br />period. <br /> <br />3 <br />