My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP08697
CWCB
>
Water Supply Protection
>
Backfile
>
8001-9000
>
WSP08697
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:49:18 PM
Creation date
10/12/2006 3:10:16 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8220.114.C
Description
Dolores Participating Project
State
CO
Basin
San Juan/Dolores
Water Division
7
Date
6/5/1964
Title
Report of the Projects Committee to the 51st National Convention of the National Rivers and Harbors Congress
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />, . <br /> <br />:("'."{\ <br />~,-'-, ) <br /> <br />df;'"'J <br />~i# <br /> <br />6 <br /> <br />and beach erosion control studies and the initiation of 20 others. A total <br /> <br />of 86 of these studies will be completed with the funds made available in <br /> <br />Fiscal Year 1965. <br /> <br />Respectfully submitted, <br /> <br />/s/ Robert T. Secrest <br /> <br />Robert T. Secrest <br />Chairman <br /> <br />Note A A project which has been placed in Class II, III, IV or V by the <br />Committee may be re-examined from time to time upon due application <br />and the submission of material supplementary information, with a view to ad- <br />vancing its classification; but no project will be reported upon by the <br />Committee more than once in each calendar year. <br /> <br />Note B Attention is called to the fact that when a project is once put in <br />Class I - Endorsed, such status continues and it is unnecessary to <br />follow up at subsequent sessions with new applications. All projects "Endorsed" <br />by the Congress, upon the recommendations of the Committee, retain their status <br />until finally constructed, unless such action is rescinded by the Congress, and <br />the Cortgress stands pledged to do everything possible to assist in reaching <br />that goal. <br /> <br />Note C A motion was unaminously passed requesting the Army Engineers <br />to make a survey and determine the location of an intake pipe in <br />the Mississippi River above Dayton, Minnesota or thereabouts, so as to <br />provide water for the Twin Lakes in Crystal Village, the Lake and City of <br />Robbinsdale, and the eight Lakes within the corporate limits of the City of <br />Minneapolis whose' present level is 3 1/2 feet below standard gauge. <br />
The URL can be used to link to this page
Your browser does not support the video tag.