Laserfiche WebLink
<br />Additional Releases <br /> <br /> <br />View 01 Weeping Rock, Green River <br /> <br />Waler Year 1980 <br />On August 21. 1979. the Colorado River <br />BasIn States and other interested parties <br />met in Salt Lake City, Utah. to diScuss <br />the operational plan for the Colorado <br />River and schedule of releases from Lake <br />Mead during water year 1980, Recog- <br />nizing the high probability of flood con- <br />trol releases being required during 19BO <br />and 1981, the plan adopted for 1980 <br />included the release from Lake Mead of <br />about 700,000 acre-feet of water in <br />excess of downstream requirements .for <br />the purposes of river regulation and <br />anticipated flood control operation. This <br />operating plan was also consistent with <br />the declaration made by the <br />Representatives of the Secretary of the <br />Intenor at the integration meeting held <br />June 13, 1979, in Boulder City, Nev" to <br />release water at Hoover Dam suHicient to <br />generate contract-defined firm energy <br />during operating year 1980. <br /> <br />The Commissioner, United States Sec. <br />tion, International Boundary and Water <br />Commission, was notified of the availability <br />of additional water for Mexico during <br />calendar year 1980 and a monthly sched- <br />ule for delivery of up to 1,700,000 acre- <br />feet pursuant to the Mexican Water <br />Treaty of 1944 was requesled, <br /> <br />During the winter and spring months <br />precipitation and snow accumulation in <br />Ihe Upper Basin resulted in higher than <br />average runoff to Lake Powell. Further. <br />more, high runoff conditions in the Bill <br />Williams River and Gila River drainages <br />mandated wInter and spring .flood con- <br />trol releases by the Corps of Eng ineers <br />from Alamo and Painted Rock Dams. <br /> <br />On April 10, 1980 a meeting of Federal, <br />State, and Basin interests to discuss <br />"Colorado River Basin Water Conditions" <br />and proposed plans for reservoir opera- <br />tions was held in Las Vegas, Ne\l. The <br />principal subject of discussion at that <br />meeting was the proposed release of an <br />average of 19,000 cubic feet per second <br />from Parker Dam beginning May 1, 1980, <br />and continuing through December 31, <br />1980, in order to avoid making future <br />releases of a flooding magnitude and, <br />coincidentally, to optimize power genera- <br /> <br />" <br /> <br />---. <br /> <br />-~~ <br />~'."",.. / .~:.~;..;::. o. .... :,. <br />~-'~--~-.~ -v..\.;.;:~;-i~~1 <br /> <br />-..... <br /> <br />,... <br /> <br />, <br /> <br />- .... :..~.. <br /> <br />l <br />-, ;.e}~;}.: '. ~.,. 7~ .~-.:~. .~ '~'~~ <br />.;>'~:;.;o;f::.~;.g~!t'...., .1";:::<':'N~ _ <br />.'_ -..,....""~l..,..(-:,.....;l-,;!';-',.i, .~*..~:~.~~_,' ..,-;: .,' :".'_ " <br />~':C'.-.';'. .. ,-..'y.:~.~;;- ."".'ff.'I:"':'~~;i;-:"~-~.::,.'.-\;.. ::~ <br />~-'.. .~i/.'.l~ ... - J. "',. ..J ..',., <br />- . ..../:-".!~..(:. ,.I?;~:~:._-.f.' ~~~ '.~~ <br />'~~- .t,~~-:-"'_.~. (f",,,-,..-:- ., . .... <br /> <br />Hoover Dam and Lake Mead <br /> <br />tion. This plan of operation, including the <br />further additional releases, was also <br />implemented consistent with the opera- <br />tional strategy approved by the Assistant <br />Secretary of the Interior in 1979, The <br />Colorado River Basin States were sub- <br />sequently notified that such releases <br />from Lake Mead during the period. which <br />would create storage space greater than <br />that reqUired by the then current flood <br />control regulations, would be accounted <br />for as being retained in storage for the <br />purposes of storage equalization under <br />Sec, 602(a), Public Law 90-537, <br /> <br />5 <br />