My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP08618
CWCB
>
Water Supply Protection
>
Backfile
>
8001-9000
>
WSP08618
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:48:57 PM
Creation date
10/12/2006 3:07:45 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8111.600
Description
ARCA Annual Reports
Basin
Arkansas
Date
12/14/1976
Author
ARCA
Title
Twenty-Eighth Annual Report Arkansas River Compact Administration for the Year 1976
Water Supply Pro - Doc Type
Annual Report
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />PROPOSED BUDGET <br /> <br />.X PROPOSED BUDGET <br /> <br />Fiscal Year July I, 1!177 - June 30, 1!178 <br />Personal Service. . . . $ 2,145.00 <br />Secrelary's Salary.. . .$1,800.00 <br />Social Security. 105.00 <br />Professional Services <br />(Audit & Recorder) 240.00 <br /> <br />U. S. Geological Survey .. <br />Cooperative Services. . <br />Slation Monitoring Equipment. <br /> <br />14.400.00 <br /> <br />.....$ 4,400.00 <br /> <br />10,000.00 <br /> <br />Capital Outlay . . <br />Ollice Equipment. <br /> <br />100.00 <br /> <br />100.00 <br /> <br />Maintenance and Operation. <br />Bond (Treasurer) .. <br />Printing. . <br />Ollicial Publications. <br />Travel Expense. <br />Typing and Mailing. . <br />Investigation and Inspection. <br />Telephone and Telegraph . <br />Office Supplies. <br />Contingency .. <br /> <br />4,150.00 <br /> <br />TOTAL BUDGET U177-1!178 . <br />._Estimated Carryover June 30. 1!177 . <br />To Be Appropriated <br />Colorado (60%). <br />Kansas (40%) ..... <br /> <br />....$ 25.00 <br />600.00 <br />100.00 <br />700.00 <br />150.00 <br />100.00 <br />375.00 <br />100.00 <br />2,000.00 <br /> <br />.... . . $20,795.00 <br />IOn.OO <br />. . . . . . . . . . $20,695.00 <br />. . $12,417.00 <br />8,Z78.00 <br /> <br />.Concrete Control1!174-1!175 . . $8,000,00 paid by Colorado <br />Colorado (60%),. . .$12,417,00 <br />'Credit. 3,200,00 9.217,00 <br />Kansas. , 8,278,00 <br />.Debit 3.200.00 11,478,00 <br />'X AS REVISED AND .APPROVED BY THE ARKANSAS RIVER <br />COMPACT ADMINISTRATION SPECIAL MEETING, ASPEN, <br />COLORADO, AUGUST 14. 1977. <br />(g) Pursuant to provisions of the Compact (Article VIIl-E(3)) and <br />of the By-Laws of the Administration (Article VII (5)). the <br />receipts and disbursements of the Administration during the <br />compact year have been audited. and the report of the audit is <br />~~reto attached as Ap""ndix "A," <br />6. ~acts about John Martin Project: <br /> <br />The John Martin Reservoir Project was built by the Corl'5 of <br />Engineers. United States Army, The project was authorized by <br />Congress in the Flood Control Act of June 22, 1936, when the lederal <br />responsibility for flood control throughout the country was assigned to <br />the Corps of Engineers. It is located on the Arkansas River, 58 miles <br /> <br />-6- <br />
The URL can be used to link to this page
Your browser does not support the video tag.