My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP08607
CWCB
>
Water Supply Protection
>
Backfile
>
8001-9000
>
WSP08607
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:48:55 PM
Creation date
10/12/2006 3:07:32 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8149.660
Description
Miscellaneous Small Projects and Project Studies - Highland Breaks Watershed
State
CO
Basin
Arkansas
Water Division
2
Date
9/1/1998
Author
USDA NRCS
Title
Highland Breaks Watershed - PL 83-566 Watershed Plan - Environmental Assessment
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
131
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />002450 <br /> <br />Authorization for planning assistance for the watershed was received in September <br /> <br /> <br />1996. A meeting was held in October 1996 with field and area staffs, the Water <br /> <br /> <br />Resources Planning staff, and sponsors to review the Plan of Work and develop <br /> <br /> <br />assignments to complete the watershed plan. <br /> <br />During January 1995, a geologic reconnaissance and reference search and report was <br />developed. <br /> <br />The Watershed Plan was developed and alternatives reviewed with the sponsors at a <br /> <br /> <br />meeting. on May 14,1997. It was the consensus of those present to move forward into <br /> <br /> <br />inter-agency review, when completion of a water mass balance conceptual model for <br /> <br /> <br />the watershed. <br /> <br />A meeting was held June 25,1997. with concerned groups to develop a conceptual <br /> <br /> <br />model for analyzing impacts on the water mass balance within the project boundaries. <br /> <br /> <br />A water mass balance was completed and a draft plan was completed. <br /> <br />A meeting was held on December 3, 1997, with the sponsors, field office, farmers, and <br /> <br /> <br />the public. The plan was presented to everyone with discussions on the alternatives. It <br /> <br /> <br />was the consensus of all to go forth into interagency review. <br /> <br />On July 24th 1998 representatives from the Colorado Water Conservation Board, State <br /> <br /> <br />Engineers office, Colorado Attorney Generals Office, Colorado Soil Conservation <br /> <br /> <br />Board, and Natural Resource Conservation Service met for plan discussion. <br /> <br />83 <br />
The URL can be used to link to this page
Your browser does not support the video tag.