Laserfiche WebLink
<br />Figure 2 <br /> <br />CRSP TRANSMISSION RATES <br /> <br />Firm Transmission Rates - $/kW - Year <br />Proposed Rate <br /> <br />10.27 <br /> <br /> 6.60 <br />, 4.50 April <br /> May <br />October 1983 <br /> 1974 <br />1965 <br /> <br />Nonfirm Transmission Rates - Mills/kWH <br />Proposed Rate <br /> <br />2.0 <br /> <br />April <br /> <br />1.0 <br /> <br />1983 <br /> <br />October <br /> <br />1965 <br /> <br />11 <br />