Laserfiche WebLink
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />. <br />I <br />i' <br />I <br />. <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />TABLE OF CONTENTS (Continued) <br /> <br />10.3.3.6 Water Court Enforcement of Water <br />Use Efficiency Goals <br />10.4 EVALUATION OF NON-STRUCTURAL ELEMENTS <br />10.4.1 Screening <br />10.4.2 Cost of Non-Structural Elements <br /> <br />11.0 PLAN FORMULATION <br />11.1 INTRODUCTION <br />11.2 OBJECTIVES OF A COMPREHENSIVE WATER RESOURCES <br />MANAGEMENT PLAN <br />11.3 PLAN FORMULATION PROCESS <br />11.3.1 Water Shortages and Alleviation Measures <br />11.3.2 Potential Sites for Water Storage <br />11.3.3 Considerations for Plan Formulation <br />11.3.4 General Criteria <br />11.3.4.1 Preliminary Design Floods <br />11.3.4.2 Storage-Yield Relationships <br />11.3.4.3 General Criteria for Structural Elements <br />11.4 COST ESTIMATING PROCEDURES <br />11.5 COMBINED PLANS <br />11.5.1 Plan A: Portal Reservoir; Trailhead Reservoir; <br />and Greyrock Mountain Pumped-Storage Project <br />11.5.1.1 Portal Dam and Reservoir <br />11.5.1.2 Trailhead Dam and Reservoir <br />11.5.1.3 Greyrock Mountain Pumped-Storage Project <br />11.5.1.4 Horsetooth Pump Station and Pipeline <br />11.5.1.5 Other Features <br />11.5.1.6 Cost Estimate for Plan A <br /> <br />-11- <br /> <br />Page <br /> <br />10-40 <br />10-41 <br />10-41 <br />10-44 <br /> <br />11- 1 <br />11- 1 <br /> <br />11- 1 <br />11-2 <br />11-2 <br />11- 5 <br />11- 7 <br />11-9 <br />11-9 <br />11-11 <br />11-11 <br />11-13 <br />11-16 <br /> <br />11-18 <br />11-19 <br />11-21 <br />11-22 <br />11-25 <br />11-26 <br />11-27 <br />