Laserfiche WebLink
<br /> <br />TABLE OF CONTENTS (Continued) <br /> <br />Page <br /> <br />9.2.2 Regional Market Area 9-11 <br />9.2.3 Summary of'Power Demand Projections 9-13 <br />9.3 MARKET VALUE OF POWER 9-16 <br />9.3.1 Current Market Prices 9-16 <br />9.3.2 Avoided Costs 9-18 <br />9.3.2.1 Public Service of Colorado (PSC) 9-19 <br />9.3.2.2 Earlier Study of Hydropower in the <br />Basin 9-21 <br />9.3.2.3 Combined Cycle Facility in the Midwest 9-22 <br />9.3.3 Summary of Market Value of Power 9-22 <br />9.4 A PROPOSED HYDROGENERATION PROJECT 9-24 <br />9.4.1 Background and Overview 9-24 <br />9.4.2 Preliminary Project Studies 9-25 <br /> <br />I <br />I <br />I <br />I <br />I <br /> <br />10.0 NON-STRUCTURAL PLAN ELEMENTS <br />10.1 GENERAL <br />10.2 IDENTIFICATION AND INITIAL SCREENING <br />10.2.1 Identification of Plan Elements <br />10.2.2 Screening of Plan Elements <br />10.3 DESCRIPTION OF NON-STRUCTURAL PLAN ELEMENTS <br />10.3.1 Water Supply Management Elements <br />10.3.1.1 Phreatophyte Control <br />10.3.1.2 Ditch Lining <br />10.3.1.3 Conjunctive Use of Ground Water and <br />Surface Water <br />10.3.1.4 Dredge Existing Reservoirs <br />10.3.1.5 Hydrologic Instrumentation <br />10.3.1.6 Reuse of Municipal Wastewater <br />10.3.1.7 Transfer of Storage Decrees <br />10.3.1.8 Transfer of Points of Diversion <br /> <br />10-1 <br />10-1 <br />10-2 <br />10-2 <br />10,:,2 <br />10-8 <br />10-8 <br />10-8 <br />10-9 <br /> <br />10-11 <br />10-17 <br />10-19 <br />10-20 <br />10-20 <br />10-22 <br /> <br />-9- <br />