<br />("'! .., t"j 'J <br />l:..L I ~} <br /> <br />t'Jate. J.\ shuws the computcd power genera- <br />tion at Hoovet power plant and actual storage <br />in Lake Mead as well as the computed power <br />generation and storage absent thc filling of the <br />Colorado Rivcr Storage Project reservoirs. Thc <br />! 965-66 energy deficiencies at Hoover power <br />plant are shown in Table 10. <br /> <br />Table 10 <br /> <br />FIRM ENERGY DEFICIENCY AT HOOVER POWER PLANT <br />CAUSED BY FILLING OF CRSP RESERVOIRS <br />Millian, of KW-Hrs <br /> <br />1965-fjlJ <br /> <br />Compuud Compuud <br />Pou:tr Powtr <br />Gtntratio1l1 Gtntration1 TfJtal <br />~1bJtr.t :/.,j/h Computtd <br />Filling Filling D,ficitflcy <br />of CRSJ' of CRSP /)uring .1((umll{ald <br />RtJtrt'oirJ RtstrfJoirJ M07l(h~ Dqfcit7lcy <br /> 16803 <br />397 332 65 IH5 <br />336 333 53 \793 <br />352 268 34 1882 <br />275 219 56 1938 <br />268 172 96 2014 <br />286 175 III 2145 <br />290 \04 186 2331 <br />258 182 76 2407 <br />376 324 52 2459 <br />4\0 349 61 2520 <br />417 366 51 257] <br />358 324 14 2605 <br />391 367 24 2629 <br />421 346 75 2704 <br />350 277 73 2777 <br /> <br />Accumulac~d <br />Deficiency as D{ <br />6-30-65_ un _u <br /> <br />July_p p_-.d-. <br />Augusc~_,_u_____ <br />September- _ _ __ _. __ <br />October __ u_. ____ <br />Novembo:r___ ____. <br />December____ <br /> <br />January_____~_,___ <br />February____ _ __ __ <br />March__ _ ___~___ <br />ApriLu____ <br />May__ ____ _____ <br />June_._ _________~ <br />J"ly__u__________ <br />AUgU5t_~__ <br />September __ _ __ ___ <br /> <br />1 Computed at 83 percent efficiency in accordance with lilhng crileriJ for Lake <br />Powell adopted Aprd 4, 1961. <br />2 Delivery of deficiency energy to HoO\'er Allottet"s may follow a dd:krent schedule <br />'Includes 200 mIllion Kilowatt hOUri 01 '.imp,mment" enerR}'. <br /> <br />New Power Developments <br /> <br />During 1965-66 considerable progress was <br />made toward increased utilization of thc coal <br />resources in the Colorado River Basin. Two <br />major coal-fired steam generating plants, the <br />Four Corners Power Plant located near Farm- <br />ington, New Mexico and Mohave Power Plant <br />located in Mohave VallC\', Nevada are the first <br /> <br />691731-204 3,67 1M <br /> <br />power projeCTS to be undertaken by electric <br />utilities as members of -W' estern Energy Supply <br />and Transmission Associates (WEST Associ- <br />ates). <br />The Four-Corners pro jeer, an addition to the <br />existing 575 -Mw plant of the Arizona Public <br />Servicc Co., will consist of two 755-Mw gen- <br />crating units. Six utilities will participate in <br />ownership of the new units with Southern. <br />California Edison Company owning the largest <br />share. Construction commenced lVlav 1966; the <br />first of the units is scheduled for operation in <br />July 1969 and the sccqnd is expected to be in <br />operation one year later. \Vater for cooling will <br />be pumped from the San Juan River under a <br />New Mexico license to divert up to 5] ,600 acrc- <br />feet annually to the Four Corners power plant <br />cooling pond, of which approximately 38,000 <br />acre-feet will be uscd consumptively. <br />The I,SOO-!Vlw coal-fired i\-!ohave power <br />plant will bc jointly owned by Southern Cali- <br />fornia Edison Company, Nevada Power Com- <br />pany, and Salt River Valley \Vater Users' As- <br />sociation; however Southern California Edison <br />Company will be thc principal owner. The first <br />750-Mw unit of the plant is expected to be in <br />opcration in 1970 and the second in ] 971. The <br />power plant will consumptively use 30,000 acrc- <br />fect annualh- of Colorado River watcr, which <br />will be charged to Nevada's entitlement. <br />A study made bv the staff of the Board <br />showed th"at current In-basin consumpti,.e use of <br />water of the Colorado River System for thermal <br />power generation is approximately 45,000 acre- <br />feet per year. It is anticipated that during the <br />next 20 years thermal plants having an aggre- <br />gate capacity of 20,000 megawatts will be built <br />to make use of thc vast coal resources in the <br />Colorado River Basin, which according to the <br />staff study would require the consumptive use <br />of an estimated additional 400,000 acre-feet an- <br />nually from the Colorado River system for <br />power purposes. <br /> <br />o <br /> <br />/'.;lIltJ jll C.^ltFOU<lA OFfICE or STATE r"INTlNG <br />