My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP08564
CWCB
>
Water Supply Protection
>
Backfile
>
8001-9000
>
WSP08564
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/29/2009 9:55:03 PM
Creation date
10/12/2006 3:04:56 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8147
Description
Gunnison-Arkansas Project
State
CO
Water Division
4
Date
2/27/1951
Author
CWCB
Title
Report of Policy and Review Committee with Proposed Principles of Operation
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
51
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />ilGi <br /> <br />:;- <br /> <br />';'''rlication from the title of the project that this diversion is but a <br /> <br />r' ~'_,3ge of a larger development, the name of the project should be changed <br /> <br />t,,, "The Roaring Fork-Arkansas Project" or "The Frying Pan-Arkansas <br /> <br />,~'"'l j~ct." This point was disllussed at length in Committee deliberations <br /> <br />~'-"t. '[0 formal action was taken thereon. <br /> <br />messrs. Delaney and White have <br /> <br />,:<'_\,e:ted that these comments contain a stat8ment of their position on <br /> <br />t--is point. <br /> <br />In line with this thought, it is noted t.hat the discussion on <br /> <br />;c,css 58 throu(;h 60 of the speeial report dated September 1949 concerninr, <br /> <br />,,', rtS f0r future expansion of the initial phase development by -iivcrsion <br /> <br />7,'",-,;. other tributaries of the Roaring t'ork River and from the Gunnison <br /> <br />~',", c: ;vas described. <br /> <br />To carry out the recommendations of this Committee <br /> <br />in this regard, it is recommended that the discussion shol'm on these <br /> <br />D~fP.3 be deleted from the final dl'aft of report. <br /> <br />~~~~tionship to Green Mountain lbservoir <br /> <br />At the meeting held January 6, 1949, in Grand Junction, Colorado, <br /> <br />t:'e Committee passed a resolution to the effect that the benefits and rights <br /> <br />0; the Western Slope in the Greel: Mountain Reservoir of the Colorado-Big <br /> <br />Thompson Proj ect as defined in Senate Document 80 (75th Congress, 1st Session) <br /> <br />shall not be impaired by the Initial Phase of the Gunnison-Ark~nsas Project. <br /> <br />More Efficient Use of Arkansas Hiver Water <br /> <br />Review of your reports discloses the fact that in the winter months <br /> <br />part of the Arkansas River streamflO'!, is diverted to irrigated lands in the <br /> <br />~alley. The tentative plans for the project contemplate the previnion of <br /> <br />storage caracity that can be used in many years to regulate such '-.'inter <br /> <br />f\ <br /> <br />-,1<;- <br /> <br />, ~ <br />
The URL can be used to link to this page
Your browser does not support the video tag.