Laserfiche WebLink
<br />. <br /> <br />. <br /> <br />o <br />....; <br />CO <br />(,,1 <br /> <br />We recommend that the results of this study be presented to <br />the Commissioner of Reclamation, USDI, and to the Director <br />of the Colorado Water Conservation Board with a request for <br />an opi ni on on the approach outl i ned in thi s report for <br />assignment of the design and construction of a major portion <br />of the West Divide Project to the West Divide Water Con- <br />servancy District. This matter has been discussed in <br />proposal form with Mr. J. William McDonald, Director of the <br />Colorado Water Conservation Board who supported this ap- <br />proach to the Commissioner. <br /> <br />A-13 <br />