My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP08501
CWCB
>
Water Supply Protection
>
Backfile
>
8001-9000
>
WSP08501
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:48:27 PM
Creation date
10/12/2006 3:01:33 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8449.918
Description
South Platte Projects
State
CO
Basin
South Platte
Date
1/1/1981
Author
CWCB
Title
South Platte River Basin Assessment Summary Version 2
Water Supply Pro - Doc Type
Publication
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />New Storage Facil- <br />ities, On-Channel <br />(Alternative IV-A) <br /> <br />For this preliminary investigation, <br />reservoirs localed on East Bijou, <br />West Bijou, and Muddy Creeks were <br />considered to demonstrate water re- <br />sources development on plains trib- <br />utaries. <br /> <br />Supply <br /> <br />The design project produces 830 acre- <br />feet of direct irrigation water deliv- <br />eries upstream from Sterling. The <br />return flows from the use of this <br />water and from the 1.670 acre-feet of <br />conveyance losses would make a <br />total of 1,300 additional acre-feet of <br />irrigation water available below the <br />design project. <br /> <br />Costs <br /> <br />The 1980 cost estimate for construc- <br />lion of the design project is $16 <br />million. The interest cost during <br />construction would be $6.6 million. <br />The annual costs for operation. main- <br />tenance. and replacement would be <br />$97,000. <br /> <br />Impacts <br /> <br />The investment requ ired would total <br />nearly $23 million in construction <br />costs and interest during construc- <br />tion. The net economic benefit would <br />be -$11 million. <br /> <br />The estimated impact on waler qual- <br />ity would represent a small positive <br />change from existing conditions. The <br />estimated impact on fish and wildlife <br />would represent a small positive <br />change from existing conditions. <br /> <br />11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.