My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP08499
CWCB
>
Water Supply Protection
>
Backfile
>
8001-9000
>
WSP08499
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:48:26 PM
Creation date
10/12/2006 3:00:41 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8410.350
Description
Basin Multistate Organizations - Missouri Basin Inter-Agency Committee
State
CO
Basin
Statewide
Date
1/1/1968
Author
DOI
Title
US Department of the Interior - Progress - Missouri River Basin Annual Report - Fiscal Year 1968
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
198
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />TRANSMISSION DIVISION <br /> <br />~~!,~~i~ <br />l~ <br /> <br /> <br />.-..J_...... ..... <br /> <br />~~~~ <br />~.~~,:.;3:1;F <br /> <br />"O~,2.~S 28. <br /> <br />The Transmission Division consists of power transmission facilities <br />necessary to interconnect and coordinate the operation of all powerplants <br />in the Missouri River Basin constructed by the Bureau of Reclamation and <br />Corps of Engineers. Transmission lines transmit firm and secondary power <br />for irrigation pumping; construction power; and power to municipalities, <br />cooperatives, private utilities, and other wholesale customers. Fower- <br />plants have been constructed by the Bureau of Reclamation on the <br />Colorado-Big Thompson, North Platte, Kendrick, Shoshone, Riverton, and <br />Missouri River Basin Projects. These are interconnected with the Fort <br />Peck, Fort Randall, Gavins Point, Garrison, Oahe, and Big Bend Power- <br />plants constructed by the Corps of Engineers; and with other Bureau of <br />Reclamation projects outside the Missouri River Basin. <br /> <br />.". :.; , . ::. -. '. .':- "~'" ',: : <br /> <br />Program FY 1968 <br />Funds available - $8,078,350 <br /> <br />Accomplishments FY 1968 <br /> <br />Expenditures - $5,241,808 <br /> <br />Complete construction: <br />73-mile Glenrock-Stegall <br />230-kv line, second section <br /> <br />Completed November 1967. <br /> <br />Initiate construction: <br />242-mile Fort Thompson-Grand <br />Island 345-kv line <br /> <br />Contracts awarded for Section I on <br />April 5 and for Section II on <br />May 3. <br /> <br />Award contract for construction <br />of South Cody 69-kv tap line <br />and Glendale Substation. <br /> <br />Bids were opened June 25 and 27 for <br />the South Cody tap line and Glen- <br />dale Substation respectively. <br /> <br />:~;.;"':--"">":"':'.;":\; <br />-: '-::1 "?-- "'10(' <br />~'~'.::: ,~3~:.>.~.~:::\:.t~(, <br />. ." "." - .'..- ." ~. :':.,-:-. <br /> <br />,,:...... <br />"' <br /> <br />....... <br />. ..- <br /> <br />"'" .:~ <br /> <br />.--, <br /> <br />26 <br /> <br />"," <br /> <br />......:->' <br />
The URL can be used to link to this page
Your browser does not support the video tag.