Laserfiche WebLink
<br />. <br /> <br />. <br /> <br />. <br /> <br />COLORADO RIVER SALINITY CONTROL PROJECT <br /> <br />McELMO CREEK UNIT <br /> <br />PROJECT STATUS REPORT <br /> <br />9/15/94 saltrocu,xls <br /> FY 90 FY 91 FY 92 FY 93 FY 94 FY 90-94 <br />PRACTICE APPLICATION UNITS TOTAL <br />Delivery System <br />Pipeline (on-farm) ft. 22,619 48.251 38,983 132.281 242.134 484.268 <br />Ditch lining (on-farm) ft, 0 0 0 0 0 0 <br />Pipeline (off-farm) ft, 0 9,430 37,563 26.572 73.565 147,130 <br />Ditch Iinino (off-farm) ft, 0 0 0 0 0 0 <br />Land Leveling ac, 0 0 0 0 0 0 <br />Irrigation Systems <br />Sprinkler no. 6 17 26 92 141 282 <br />Sprinkler ac, 161 396 392 1.985 2,934 5,868 <br />Improved surface system no. 3 2 14 14 33 66 <br />Improved surface system ac, .121 20 48 135 324 648 <br />Drip system' no. 0 0 0 0 0 0 <br />Drip system ac, 0 0 0 0 0 0 <br />Regulating reservoirs no. 0 0 0 0 0 0 <br />Regulatino reservoirs ac, 0 0 0 0 0 0 <br />Irrigation water manaoement ac, 302 487 597 820 2,206 4,412 <br />Wildlife wetland habitat mot. ac, 0 2 1 53 56 112 <br />Wildlife upland habitat mot. ac, 0 0 3 187 190 380 <br />Reduction of salt loading ton/yr 540 1.755 1,266 . 4.812 8.373 16,746 <br />Reduction of deep percolation ac ft/yr 167 376 295 1.013 1,851 3,702 <br />McELMO CREEK UNIT FY 90 FY 91 FY 92 FY 93 FY 94 FY 90-94 <br /> TOTAL <br />Number of contracts funded 9 29 53. 49 39 179 <br />Acres of contracts funded 1.135 3.378 3,311 2.317 3,065 13.206 <br />Cost/share of contracts funded 396.781 815,041 999,336 724.272 791,053 3,726,483 <br />Cost/share left to allocate 3.219 82,129 8,567 324 687 687 <br />A verage cost/share per contract 44.087 28,105 18,855 14.781 20,283 20,818 <br />. Average cost/share per acre 350 241 301 313 258 282 <br />Applications awaiting contracts 125 135 152 143 157 157 <br />Contracts currently on the shelf 0 0 4 5 5 5 <br />Cost/share of contracts on the shelf 0 0 87,207 63,258 131,844 131,844 <br />Contracts currently being planned 5 6 22 41 J q~<<~ 2 23 <br />Cost/share for wildlife mitigation 18.370 71,159 98.904 71.333 280,607 <br />Percent of CIS for wildlife replacement 4.6 9 9.1 10 3 8 <br />