Laserfiche WebLink
<br />July 26: <br />July 28: <br />July 29: <br />July 29: <br />August 1: <br /> <br />August 2: <br />August 3: <br />August 4: <br /> <br />August 20: <br />August 20: <br />August 21: <br />August 22: <br />August 23&24: <br />August 25: <br />August 26: <br /> <br />3 <br /> <br />~~h' <br />.,....~ . <br />-.... ~~.. <br />""f <br /> <br />Flow of CR near Cameo was 2,570 cfs, <br /> <br />Resumed operation of the OMID Check (36 cfs). (Calder) <br /> <br />Resumed C-8T Replacement Release (77 cfs). (US8R) <br />Resumed Storage Release for Silt Project (23 cfs). (USBR) <br />Resumed Storage Release for Natural Flow Shortage (299 cfs). <br />(USBR) <br /> <br />Flow of CR near Dotsero was 1,260 cfs, <br /> <br />Flow of CR near Cameo was 1,600 cfs. <br /> <br />1977 maximum instantaneous flow of the Blue River below GMR <br />was 916 cfs, (USGS) <br /> <br />Flow of CR near Cameo was 2,130 cfs, <br /> <br />OMID Check not operated. (Calder) <br />OMID Check operated (11 cfs). (Calder) <br />OMID Check not operated, (Calder) <br />OMID Check operated (16 & 65 cfs). (Calder) <br />OMID Check not operated. (Calder) <br />OMID Check operated (223 cfs). (Calder) <br />August 27: USA Powerplant Unit #2 resumed generation. (PSCo) <br />August 27: OMID Check not operated, (Calder) <br />August 28: Flow of the CR near Cameo was 1,950 cfs, <br />August 28: Resumed operation of the OMID Check (41 cfs). (Calder) <br />September 1: Flow of CR near Dotsero was 1,350 cfs. <br />September 2: Flow of CR near Cameo was 1,740 cfs. <br />September 6: USA Powerplant Unit #1 resumed generation. (PSCo) <br />September 7: USA Powerplant Unit #2 ceased generation. (PSCo) <br />September 15: USA Powerplant Unit #2 resumed generation. (PSCo) <br />September 29: Ceased Storage Release for Silt Project (Total for the season <br />was 1,300 acre-feet). (AOP - USBR) <br />