My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP08487
CWCB
>
Water Supply Protection
>
Backfile
>
8001-9000
>
WSP08487
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:48:24 PM
Creation date
10/12/2006 3:00:31 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8240.200.43.H.1
Description
Grand Valley/Orchard Mesa -
State
CO
Basin
Colorado Mainstem
Water Division
5
Date
3/7/1994
Title
Case 91CW247 Check Case - 1977 & 1989 Streamflow, Diversion and Reservoir Data
Water Supply Pro - Doc Type
Data
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
71
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />July 26: <br />July 28: <br />July 29: <br />July 29: <br />August 1: <br /> <br />August 2: <br />August 3: <br />August 4: <br /> <br />August 20: <br />August 20: <br />August 21: <br />August 22: <br />August 23&24: <br />August 25: <br />August 26: <br /> <br />3 <br /> <br />~~h' <br />.,....~ . <br />-.... ~~.. <br />""f <br /> <br />Flow of CR near Cameo was 2,570 cfs, <br /> <br />Resumed operation of the OMID Check (36 cfs). (Calder) <br /> <br />Resumed C-8T Replacement Release (77 cfs). (US8R) <br />Resumed Storage Release for Silt Project (23 cfs). (USBR) <br />Resumed Storage Release for Natural Flow Shortage (299 cfs). <br />(USBR) <br /> <br />Flow of CR near Dotsero was 1,260 cfs, <br /> <br />Flow of CR near Cameo was 1,600 cfs. <br /> <br />1977 maximum instantaneous flow of the Blue River below GMR <br />was 916 cfs, (USGS) <br /> <br />Flow of CR near Cameo was 2,130 cfs, <br /> <br />OMID Check not operated. (Calder) <br />OMID Check operated (11 cfs). (Calder) <br />OMID Check not operated, (Calder) <br />OMID Check operated (16 & 65 cfs). (Calder) <br />OMID Check not operated. (Calder) <br />OMID Check operated (223 cfs). (Calder) <br />August 27: USA Powerplant Unit #2 resumed generation. (PSCo) <br />August 27: OMID Check not operated, (Calder) <br />August 28: Flow of the CR near Cameo was 1,950 cfs, <br />August 28: Resumed operation of the OMID Check (41 cfs). (Calder) <br />September 1: Flow of CR near Dotsero was 1,350 cfs. <br />September 2: Flow of CR near Cameo was 1,740 cfs. <br />September 6: USA Powerplant Unit #1 resumed generation. (PSCo) <br />September 7: USA Powerplant Unit #2 ceased generation. (PSCo) <br />September 15: USA Powerplant Unit #2 resumed generation. (PSCo) <br />September 29: Ceased Storage Release for Silt Project (Total for the season <br />was 1,300 acre-feet). (AOP - USBR) <br />
The URL can be used to link to this page
Your browser does not support the video tag.