My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP08483
CWCB
>
Water Supply Protection
>
Backfile
>
8001-9000
>
WSP08483
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:48:23 PM
Creation date
10/12/2006 3:00:23 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8200.750
Description
San Juan River General
State
CO
Basin
San Juan/Dolores
Water Division
7
Date
6/11/1952
Author
BOR
Title
South San Juan Project - New Mexico - Status Report - June 1952
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
90
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />003162 <br /> <br />~ <br /> <br />CHAPTER II <br /> <br />GENERAL DISCUSSIONS <br /> <br />The South San Juan project arn the Indian Ship rock project in the <br />first stage of development could meet the need for flood control. The <br />need is particularly great at Farmington and Shiprock. The Navajo Dam <br />as planned would remove a serious flood hazard in those areas. It would <br />permit the storage of water for irrigation and abate pollution. <br /> <br />Undeveloped Resources <br /> <br />Although some progress has been rrade in the development of the <br />many natural resources of the San Juan River Valley and the San Juan <br />Basin, it is only a "drop in the bucket" compared to future possibili- <br />ties. <br /> <br />.. <br /> <br />In or nea r the project area and throughout most of the San Juan <br />Basin are tremendous undeveloped bodies of coal. Some of these depos- <br />its are reported to be of excellent coking quality While others are <br />valuable for the potential production of synthetic gas and oil and <br />related products. Because of the lack of suitable rail transportation, <br />most of the coal mining in the basin bas been for local use. The proj- <br />ect area is sitmted roughly in the center of a natural gas field <br />reputed to: be the largest undeveloped field in the United States. A <br />pipeline to carry a pa.rt of the gas produced to centers in Arizona and <br />California. is now under construction. Gas to meet the demnds' of the <br />central portion of New Mexico is also supplied from this field. Large <br />deposits of uranium minerals on the Navajo Reservation near "Four <br />Corners Area" have been discovered, and intensive prospecting of the <br />reservation and areas adjacent to it is in progress. Large-scale mining <br />and processing of this ore have nb~ been started. North of the project <br />area, in the Colorado portion of the basin,are huge stands of timber, <br />particularlY pine and spruce, Which are only partially utilized at pres- <br />ent. Undeveloped or partially developed mineral resources in the <br />Colorado area include tungsten, vanadium, uranium, gold, silver, lead, <br />and zinc. <br /> <br />Many undeveloped resources center around potential irrigation proj- <br />ects in the San Juan River Valley and the development of the valley's <br />waters for the production of hydroelectric power. Fertile valleys, <br />terraces, and mesas contain thousands of acres of new land that, with <br />irrigation, will support. productive farmsteads and be the means of <br />livelihood for hundreds of new farm families. <br /> <br />Economic Conditions <br /> <br />. <br /> <br />General economic conditions in the region and in communities border- <br />ing the project area have been favorable in recent years. These conditions <br />have resulted from several factors, the most important being good farm <br />prices. Other factors contributing to the improved conditions are the <br /> <br />19 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.