My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP08473
CWCB
>
Water Supply Protection
>
Backfile
>
8001-9000
>
WSP08473
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:48:21 PM
Creation date
10/12/2006 3:00:02 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8220.200.07.D
Description
Dominguez Reservoir Project
State
CO
Basin
Gunnison
Water Division
4
Date
1/28/1982
Title
CWCB: Agenda Item 7 February 5 1982 Board Meeting--Dominguez Reservoir Project
Water Supply Pro - Doc Type
Board Memo
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />? ~J <br /> <br />t'- <br />co <br />~ <br /> <br />STATE OF COLORADO <br /> <br />'- <br /> <br />COLORADO WATER CONSERVATlOr, BOARD <br />Depij(fmenr or ."Jarural Resources <br /> <br />3':3 Sr;lte CenrennlJI Building <br />1313 Sherman Streer <br />Denver. Colorado 80203 <br />Phone: 13031839-3441 M E M 0 R <br /> <br />AN DUM <br /> <br />/5f7o~ <br />I,~~:~~~~;~\ <br /> <br />It., ."' ._'.' <br />\"",,~~/., <br />''''~~'../ <br />~/ <br /> <br />TO: <br /> <br />"lembers, CWCB <br /> <br />Ricnard D. LJ'T1rT1 <br />Governor <br />J. \\ljiliJm \'j,OonJld <br />D'ref7lOr <br />Oa...id Vlalker <br />Deputy Dlrec~or <br /> <br />FROM: <br /> <br />Bill McDonald <br /> <br />DATE: January 28, 1982 <br /> <br />SUBJECT: Agenda Item 7, February 5, 1982, Board Meeting-- <br />Dominguez Reservoir Project <br /> <br />Introduction <br /> <br />The U.S. Bureau of Reclamation (Bureau) was authorized in <br />1972 to conduct a feasibility study of the proposed Dominguez <br />Reservoir Project, which project would be located on the lower <br />Gunnison River about 10 miles south of Grand Junction. The <br />Bureau has recently released the Draft Feasibility Report and <br />Advance Draft EIS (December, 1981) for the project. <br /> <br />Comments are being solicited from interested parties prior <br />to the finalization of the report. In particular, the Regional <br />Director, Cliff Barrett, has advised that the Bureau would like <br />to know what further steps, if any, the State of Colorado would <br />like to take with respect to the project. <br /> <br />Summary of Project Alternatives <br /> <br />The draft feasibility study examines several alternatives, <br />or so-called candidate plans. The candidate plans are as <br />follows: <br /> <br />1. Peaking power plan (plan 3 in the report) <br /> <br />2. "lunicipal and industrial water supply plan (plan 9 in <br />the report) <br /> <br />3. Environmental quality plan (plan 7 in the report) <br /> <br />4. Non-structural plan (plan 8 in the report) <br /> <br />The first two of these plans would involve the construction of <br />Dominguez Reservoir, while the latter two plans would involve no <br />reservoir at all. The peaking power and non-structural plans <br /> <br />COLORADO WATER CONSERVATICN BCARD, F'ecerieK V, Kroeger. Chairman <br />Rebert A. JacKson. Vice Chairman. John R. FetCher, Steamboat Springs <br />C.M. Furneaux, WaJden . Floyd L. Gatz. Monte Vista. Patrick A. Gormley. Grand Junction <br />Richard W. Johnston. Montrose. David W. ?cbbins, Denver. Herbert H. Vandemoer, Sterling <br />
The URL can be used to link to this page
Your browser does not support the video tag.