Laserfiche WebLink
<br />w <br />~ It is not possible to predict future salinity concentrations for any <br />00 <br />C.ll particular month, nor can it be assumed that past flow and concen- <br /> <br />tration cycles wi II be repeated in the future. <br /> <br />It is premature to define numerical standards of salinity levels at <br /> <br />Imperial Dam now or in the next 2 or 3 years. It is essential that <br /> <br />the available technical knowledge of the physical and social factors <br /> <br />involved and their interrelationships and the probable consequences <br /> <br />of proposed changes be fully understood before applying numerical <br /> <br />standards. <br /> <br />Program Appraisals <br /> <br />Appraisal of program progress and direction will be made at intervals <br /> <br />of 2 years. The factors to be considered include: (1) kinds of phys- <br /> <br />ical control works needed, (2) economic viability of proposed control <br /> <br />works, (3) public acceptance and commitment to the proposals, (4) pot en- <br /> <br />tial impacts of evolving technology, and (5) relationships within the <br /> <br />basin-wide management plan. <br /> <br />xx <br /> <br />