Laserfiche WebLink
<br />.. <br /> <br />m <br />'f' <br />:t: <br /> <br />Table ES-l, Summary of Potential Impacls of the Execution of the lA, Adoption of the lOP, and Implementation of Biological <br />Conservation Measures (Page 25 of 29) <br /> <br />IT1 <br />>< <br />'" <br />2 <br />~ <br /><;' <br />'" <br /><n <br />~ <br />3 <br />3 <br />" <br />..;! <br /> <br />(:) <br />IT1 <br />~ <br /><n <br />I <br />- <br />" <br />~ <br />~ <br />" <br />..;! <br /> <br />Resource/Issue No Action Impacts oj Proposed Actioll/Altematives <br />COil:chella Valley Water District. Potential air There is the likelihood that some of the facilities The impact of emissions from construction of new <br />quality impacts from construction and operation considered in the proposed action may still be facilities would cause temporary impacts to local air <br />of new facilities. constructed in the CVWD service area to quality and could exceed air emission thresholds <br /> accommodate other elements of the CVWMP not established by the South Coast Air Quality <br /> directly related to the IA and QSA. This could Management District (SCAQMD) within the South <br /> result in air quality impacts that are similar to those Coast Air Basin (SCAB) project region. Mitigahon <br /> described in the proposed aclion. CVWD might measures for this impact will be identified in the <br /> undertake other actions to increase their overall Programmatic Environmental Impact Report (PEIR) <br /> water supply reliabilitY: These actions might being prepared by CVWD for the CVWMP or in <br /> include increased water conservation, increased project-level documents prepared for the <br /> reliance on other water supplies, such as the Slate construction of specific program components. <br /> Water Project (SWP) or groundwaler, or further Operation of facilities associated With <br /> development of new supplies through recycling ~:>r implementation of the IA and QSA within the <br /> desalination. Some ot these actions might require CVWD service area would have minimal impacts on <br /> construction, which would have air quality air quality, <br /> impacts. <br /> AIR QUALITY <br />The Melropolitan Water District. No new The reliability at Colorado River water supplies None. <br />construction or changes in the operation of would not be increased for MWD under this <br />existing facilities. alternative, and this agency might undertake other <br /> actions to increase their overall water supply <br /> reliability. These actions might include increased <br /> water conservation, increased reliance on other <br /> water supplies, such as the swr or groundwater, or <br /> further development of new supplies through <br /> recycling or desalination. Some of these actions <br /> might require construction, which would have air <br /> quality impacts. <br /> <br />tv <br />C <br />C <br />tv <br /> <br />~ <br />~ <br />o <br />:-0 <br />" <br />~ <br />... <br />:o<l <br />'" <br />;:; <br />~ <br />'" <br />... <br />~ <br />... <br />'" <br />, <br />::. <br />;.. <br />Q <br />9' <br />in <br />IT1 <br />- <br /><n <br /> <br />- <br /> <br />- <br /> <br />- <br /> <br />-- <br /> <br />- <br /> <br />- <br /> <br />- <br /> <br />- <br /> <br />- <br /> <br />.. <br /> <br />- <br /> <br />'= <br /> <br />- <br /> <br />- <br /> <br />- <br /> <br />- <br /> <br />.. <br />