My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP08458
CWCB
>
Water Supply Protection
>
Backfile
>
8001-9000
>
WSP08458
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:48:18 PM
Creation date
10/12/2006 2:59:44 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8282.751
Description
Colorado River Operations
Basin
Colorado Mainstem
Date
1/1/2002
Author
USDOI/BOR
Title
Draft Environmental Impact Statement Vol 1 Implementation Agreement, Inadvertent Overrun and Payback Policy and Related Federal Actions
Water Supply Pro - Doc Type
Publication
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
42
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />- <br /> <br />Table ES-l, <br /> <br />Summary of Potential Impacts of the Execution of the lA, Adoption of the lOP, and Implementation of Biological <br />Conservation Measures (Pa!;" II of 29) <br /> <br />'" <br />.. <br />" <br />g <br />- <br />;;. <br />" <br />~ <br />3 <br />:! <br />" <br />~ <br /> <br />en <br />.." <br />N <br />o <br /> <br />l <br /> <br />Rt!SOllrcejls5ue <br /> <br />No Action <br /> <br />Impacts of Proposed Action/Alternatives <br /> <br />tl <br />'" <br />- <br />'" <br />I <br />"- <br />" <br />" <br />~ <br />~ <br /> <br /> HYDROELECTRIC POWER <br />Coach~lla Vallev Water District. Potential None. None. <br />impact to hydroelectric power. <br />Jhe Metrooolitan Water District. Potential None. MWD could be economically impacted because the <br />impact to hydroelectric power. reduction in energy would mean less Federal power <br /> to pump Colorado River water through the <br /> Colorado River Aqueduct. <br />San Diee.o County Water Authoritv. Potential None. None. <br />impact to hydroelectric power. . <br />Salton Sea. Potenhal impact to hydroelectric None. None. <br />power. <br />Inadvertent Overrun rolicy <br />Potential impact to hydroelectric power from None. Proposed lOP: The JOI' would have positive <br />increases and decreases in the Colorado River impacts on P9wer production during overrun years. <br />flow during select portions of the 75-year time and negative impacts during payback years. Power <br />period. production at Hoover, Davis, Parker, and Hcadgate <br /> Rock Dams would be impacted. <br /> No Forgiveness Alternative: Similar to Ihe proposed <br /> lOP. <br />Biological Conservation Measures <br />Potential impact to hydroelectric power (rom None. None. <br />restoration or crealion of habitat along the <br />Colorado River between Parker Dam and <br />Imperial Dam. <br /> <br />N <br />C <br />C <br />'" <br /> <br />?: <br /> <br />.... <br />o <br />~ <br />" <br />" <br />"- <br />:>l <br />" <br />;;;- <br />;;r <br />"- <br />~ <br />"- <br />" <br />~ <br />=- <br />;.. <br />" <br />- <br />sf <br />in <br />'" <br />- <br />'" <br /> <br />.. <br /> <br />... <br /> <br />- <br /> <br />- <br /> <br />- <br /> <br />- <br /> <br />- <br /> <br />- <br /> <br />... <br /> <br />- <br /> <br />- <br /> <br />- <br /> <br />.. <br /> <br />- <br /> <br />- <br /> <br />- <br /> <br />- <br />
The URL can be used to link to this page
Your browser does not support the video tag.