Laserfiche WebLink
<br />00 <br />""" <br />~ <br /> <br />SUMMARY SHEETS (Continued) <br /> <br />PROJECT FEATURES <br /> <br />Rifle Gap Dam <br />L~cated on Rifle Creek at the junction of East and West Rifle <br />Creeks, 7 miles north of Rifle, Colo. <br />Type . . . . . . . . .. Bolled earth, sand, and gravel fill <br />Height above streambed (ft.) . " 115 <br />Crest length (ft.) . . . . . " 1,500 <br />Volume (cu.-yds.) ..... 1,561,000 <br />Spillway capacity (sec.-ft.) . 5,000 <br />Outlet capacity at water surface <br />elevation 5,908 ft. (sec.-ft.) <br />Rifle-Gap Reservoir (ac.-ft.) <br />Active capacity <br />Inactive capacity . . <br />Dead storage capacity. <br />Total capacity <br />Surcharge capacity <br />Davie ditch reconstruction <br />Length (mi.) . . . . . . . . <br />Initial capacity (sec.-ft.). <br />Grass Valley Canal rehabilitation <br />Length (mi.) . . . . . . . . <br />Initial capacity (sec.-ft.). <br />Dry Elk Valley lateral <br />Length (mi.) . . . . . . . . <br />Initial capacity (sec.-ft.). <br />Silt Pumping Plant <br />Located on Colorado River 2 miles upstream from Silt, Colo. <br /> <br />Type . . . . . . . Three electric motor driven <br />horizontal centrifugal pumps <br />Pump lift (ft.) .. . . . . . . .. 210 <br />Capacity (sec.-ft.). 32 <br />Sil t Pump Canal <br />Length (mi.) . . . . . <br />Initial capacity (sec.-ft.). <br />Drains <br />Length of construction (mi.) ... <br />Easements on natural channels (mi.). <br /> <br />112 <br /> <br />. . <br /> <br />10,910 <br />540 <br />1,200 <br />12,650 <br />2,400 <br /> <br />. . <br /> <br />6 <br />18 <br /> <br />. . <br /> <br />1.4 <br />60 <br /> <br />. . <br /> <br />1.8 <br />20 <br /> <br />. <br /> <br />. <br /> <br />8.1 <br />32 <br /> <br />. <br /> <br />13 <br />17 <br /> <br />REMARKS <br /> <br />The Silt Water Conservancy District, organized in 1957, will be <br />the contracting and administrative agency for the project. Repre- <br />sentatives of the district have indicated a willingness to contract <br />with the United States for repayment of project costs. <br /> <br />5 <br />