My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP08437
CWCB
>
Water Supply Protection
>
Backfile
>
8001-9000
>
WSP08437
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:48:11 PM
Creation date
10/12/2006 2:58:54 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8220.105.LJ
Description
Navajo Reservoir
State
NM
Basin
San Juan/Dolores
Date
12/1/1983
Title
Draft Hydrologic Determination - December 1983 - Water Availibility from Navajo Reservoir and the Upper Colorado River Basin for Use in New Mexico
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />_., ~'n' "' ...... C""",, .....-.:'................. ,c:..I._..'''~.o(_ ...:.J..;'r--A'+-~"..,;;..lI.-:.':.-:..':-~~.::. <br />It<tf':':>. ( <br />~'<~,--.) ,~. <br />, . '1<" ~ <br />l ' <br />i., <br />I,' <br />I! <br />.. <br />... <br />!: <br />r <br />f <br />~; <br /> <br />., <br /> <br />.:'Q\ <br />~~~ <br />')I:.>' <br /> <br />4 <br /> <br />i. <br /> <br />possibly be fully depreciated by the year 2005. Therefore, in order that: (1) <br /> <br />UII can use the water in an energy project; (2) the United States can realize <br /> <br />significant repayment toward the investment costs of the Colorado River Storage <br /> <br />Project; and (3) Other competing users can more fully utilize the remaining <br /> <br />interim supplies in Navajo Reservoir, the State of New Mexico has requested the <br /> <br />availability of tbe Navajo Reservoir water supply be certified past the year <br /> <br />200S. <br /> <br />III. Hydrologic Investigation <br /> <br />The Department of Interior's present position on water availability in the Upper <br /> <br />Basin is that for planning purposes, it will be assumed that up to 5.8 MAP of <br /> <br />water can be safely depleted annually in the Upper Basin. This number was <br /> <br />derived from three assumptions: (1) the lowest 34-year period of natural <br /> <br />runoff; (2) tolerable shortages to irrigated agriculture; and (3) delivery of <br /> <br />half the Mexican Treaty commitment from the Upper Basin. <br /> <br />As to water use in the Upper Basin, subsection (b) of Article III of the Upper <br /> <br />Colorado River Basin Compact permits New Mexico or any other Upper Basin State <br /> <br />to use waters in excess of its percentage allotment, provided such excess use <br /> <br />does not prohibit any of the remaining Scates from utilizing its respective <br /> <br />allotment. Thus the availability of Nsvajo Reservoir water for municipal and <br /> <br />industrial purposes in New Mexico extended beyond the year 2005 depends upon the <br /> <br />extent of water use in the entire Upper Basin beyond 2005 as well as upon th~ <br /> <br />physical availability of water in Navajo Reservoir. <br /> <br />To avoid a critical compact interpretation, we assume that the Upper Basin will <br /> <br />be obligated to deliver 75 MAP of water every 10 years at Lee Ferry, plus <br /> <br />!. <br />( <br />. <br />~ <br />f <br />L <br />j;.:. <br />\' <br />,. <br />J <br />( <br />,. <br />I.. <br />k <br />~, <br />r <br />", <br />, <br />\ <br /> <br />.'. <br /> <br />,. <br />F' <br /> <br />;~J' <br />r.-. <br /> <br />f, <br />f <br />~f~ <br />~,'~ <br /> <br />,. <br /> <br />~,' <br />r <br />I <br />i,! <br />'t- <br />'.' <br />f',", <br />., <br />.: <br />~, <br />f <br />t:' <br />r <br />r <br />j <br /> <br />i~, <br /> <br />f <br />k <br />.' <br /> <br />" <br /> <br />',' <br /> <br />i, <br />
The URL can be used to link to this page
Your browser does not support the video tag.