My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP08423
CWCB
>
Water Supply Protection
>
Backfile
>
8001-9000
>
WSP08423
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:48:06 PM
Creation date
10/12/2006 2:58:44 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8200.766
Description
Gunnison River General
State
CO
Basin
Gunnison
Water Division
4
Date
9/4/1991
Author
Various
Title
Gunnison River Basin Water Management and Planning Accounting Spreadsheet - Task 2 Memorandum - Examination of Basin Administration and Operation - Appendix B-Technical Subcommittee Meeting Summaries
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
90
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />. <br /> <br />. <br /> <br />. <br /> <br />[lQ~)?5Cl <br /> <br />.;j~....,,;/'..-,--.--. - ,...... <br /> <br />-'. <br /> <br />2. Review assumptions, input data, methodologies applied in development of natural <br />inflows for Phase 1 study; provide recommendations for areas of revision or refinement; <br />implement revisions agreed on following discussion with GJPO personnel. <br /> <br />Areas for review include: <br /> <br />--assumptions made in developing CRSS natural flow estimates for Gunnison River at <br />Crystal Dam station. (Flows used as base for developing natural flow estimates for <br />areas above Crystal Dam Similiar review of CRSS Gunnison River nr. Grand Junction <br />natural flow estimates should be done if considered for use in e>,:panding basin flow <br />coverage. <br /> <br />--review of consumptive use rates applied in developing natura] flow estimates; (Use <br />of 5-year consumptive use study results?) <br /> <br />--review of irrigated acreage estimates applied in Phase 1 work. ( Review with respect <br />to 1987 Upper Gunnison remote sensing irrigated acreage summary). <br /> <br />--review correlation work done for record extension in Phase 1 work <br /> <br />--review elevation-yield curves developed for Phase 1 (used in estimating yields for <br />ungaged areas) <br /> <br />--review methodology applied in determining monthly distribution patterns for ungaged <br />area yields <br /> <br />--review irrigation depletion accounting methodology used in natural flow development <br />(net depletions vs. diversions and returns) <br /> <br />--review problem areas identified in Phase 1 study (e.g., indication that supply and <br />demand conditions did not adequately represent observed shortages in the East River <br />basin) <br /> <br />3. Develope natural flows for additional sites if need is identified (e.g., sites required for <br />elevation-yield curve modification) <br /> <br />4. Extend period of record for selected sites developed in Phase 1 study through water <br />vear 1989. <br /> <br />5. Review existing GIS capabilities a\'aiJable for Gunnison Basin (USGS,USBR); <br />recommend applications relevant to completion of activities discussed above; implement <br />applica1ions as agreed to following discussion ,-,,'ith GJPO personnel <br /> <br />6. Re\'iew exis1ing data available in GJPO for use in study completion. <br /> <br />4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.