Laserfiche WebLink
<br />-) <br /> <br />~ <br /> <br />b, Make two additional sample passes through the study reaches, Sample all <br />backwaters and record 1 ocat ion of backwaters sampled, main channel and <br />backwater temperatures, size, and depth of backwater, and numbers of <br />marked and unmarked fish captured, On second pass, make a caudal clip in <br />addition to the unique reach mark (to identify which recaptures occurred <br />during which pass), <br /> <br />c, Est imate number of age-O Colorado squawfi sh occupyi ng 20 mil e study <br />reaches, sei n i ng catchabi 1 ity coeffi c i ents, and probabil i ty fi sh move <br />varying distances per day. <br /> <br />2, Intensify the UDWR and Bio/West spring monitoring (i ,e" expand sampling from two <br />backwaters per five miles to most backwaters per five miles) in the nursery <br />areas (rmi 320 - 215, 120 - 0) for fish marked the previous fall, Record <br />location, temperatures, size, depth of each backwater and numbers of marked and <br />unmarked Colorado squawfish captured, <br /> <br />3, Make population estimates in the same 20 mile reaches in the upper and lower <br />river in early April, <br /> <br />a. In conjunction to the spring monitoring, Mark approximately 600 fish in <br />each study reach. <br /> <br />b, Make two recapture passes; on second pass, mark fish with corner caudal <br />clip in addition to unique subreach mark, <br /> <br />c, Make parameter estimates, <br /> <br />4. Determine timing and extent of age-l Colorado squawfish dispersal as related to <br />fl ow, <br /> <br />a, At three downstream sampling locations, seine backwaters between 15 April <br />and 15 July to determine timing of dispersal, <br /> <br />b. About 15 July, seine backwaters from rmi 290 - 215 and rmi 120 - 50 to <br />determine post runoff distribution of age-I fish. <br /> <br /> 5, Write report <br />VI. Task description (FY 95) <br /> Tasks 1 . 4 listed above, <br />VII. Study Schedule (annually) <br /> FY 95 tasks I - 4 <br /> FY 96 t asks I - 4 <br /> FY 97 tasks 1 - 5 <br /> <br />3 <br />