My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP08418
CWCB
>
Water Supply Protection
>
Backfile
>
8001-9000
>
WSP08418
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:48:05 PM
Creation date
10/12/2006 2:58:23 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8220.114.I
Description
Dolores Participating Project
State
CO
Basin
San Juan/Dolores
Water Division
7
Date
3/24/1989
Author
USDOI-BOR
Title
Final Supplement to the Final Environmental Statement
Water Supply Pro - Doc Type
EIS
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />FINAL SUPPLEMENT fa THE <br />F 1. ~AL F,NV I R.ON~1ENTAL ST,A.TEJ'vfENT <br /> <br />DOLORES PRO.TECT <br /> <br />MONn:~UMA AND DOLORES COUNTHS, COLORADO <br /> <br />Prepared by <br /> <br />U.S. Depart,nent of the Interior <br />Bureau of Reclamation <br />Upper Colorado Region <br />Salt Lake City, Utah <br /> <br />This Final Supplement to the Final Environmental Statement (FES) to the <br />Dolores Project describes project modifications since completion of the <br />1977 Final Environmental Statement on May 9, 1977, (FES 77-12) and a <br />Finding of No Significant Impact approved May 11, 1981, for the addition <br />of two hydroelectric powerplants to the project. The project modifica- <br />tions include adding salinity control and changin~ the alignment of the <br />Towaoc Canal from west of Cortez, Colorado, to the east of the city. In <br />adrlition, refinements woulrl be made to the project plan by deletin~ <br />Monument Creek Reservoir and the Cortez-Towaoc Municipal and Industrial <br />Pipeline from the plan; combinin~ the capacities of two punping plants <br />into one plant near Dove Creek, Colorado; constructing a delivery pump- <br />ing plant near Cahone, Colorado, as an economical alternative to <br />increasing pipe size; increasing the capacities of the McPhee and Towaoc <br />Powerplants; and improving the operation, maintenance, lind replacement <br />of the project by installin~ a computerized system. <br /> <br />For further information on the processing or content of this document, <br />please contact the Regional Environmental Officer, Bureau of <br />Reclamation, 125 South State Street, PO Box 11568, Salt Lake City, Utah <br />84147, or call commercial (801) 524-5580 or FTS 588-5580. <br /> <br />Draft Statement No. INT-DES 76-44 dated November 1, 1976 <br /> <br />Final Statement No. INT-FES 77-12 dated May 9, 1977 <br /> <br />Draft Supplement to the FES No. INT-DES 88-11 <br /> <br />Date filed with the EPA: March 2, 1988 <br /> <br />Final Supplement to the FES No. 1;'J<:S (. J ,t. Gl <br /> <br />Date filed with the EPA: <br /> <br />MAn 2 't 1988 <br />
The URL can be used to link to this page
Your browser does not support the video tag.