Laserfiche WebLink
<br /> "" <br /> , <br /> ." <br /> '>0- <br /> p, <br /> <::) <br /> c:... <br /> BLUE RIVER PROJECT OPERA TIONS -.J <br /> c.-;> <br /> WA TER YEAR 2000 --I <br />COLORADO SPRINGS 1948 BLUE RIVER RETURN FLOWS <br /> TABLE 5 <br /> ACRE FEET <br /> (1) (2) (3) (4) (5) <br /> NET TRIB TO NET COlO COlO SPGS 1948 TO 1948 <br /> WASTEWATER SPRINGS PERCENT POTABLE RETURN <br />MONTH PLANT INFLUENT RETURN SYSTEM FLOWS <br />OCTOBER 6,228 4,200 67.437 2,980 2,010 <br />NOVEMBER 5,115 3,964 77.498 2,505 1,941 <br />DECEMBER 4,161 3,954 95,025 1,970 1,872 <br />JANUARY 4,208 3,895 92.562 902 835 <br />FEBRUARY 3,963 3,704 93.465 628 587 <br />MARCH 4,263 4,000 93,831 630 591 <br />APRil 6,518 3,931 60.310 712 429 <br />MAY 10,802 4,059 37,576 4,361 1,639 <br />JUNE 11,938 3,938 32.987 1,075 355 <br />JULY 11,988 4,188 34.935 1,144 400 <br />AUGUST 10,847 4,295 39.596 407 161 <br />SEPTEMBER 10,070 4,139 41.102 988 406 <br />TOTALS 90,101 48,267 54 18,302 11 ,226 <br /> <br />