Laserfiche WebLink
<br /> 0 <br /> BLUE RIVER PROJECT OPERA TIONS Q <br /> Q <br /> WA TER YEAR 2000 -.J <br /> c::: <br /> LOCAL DELIVERIES TO COLORADO SPRINGS POTABLE SYSTEM w <br /> TABLE 3 <br /> ACRE FEET <br /> (1) (2) (3) (4) (5) (6) (7) (8) (9) <br /> PIKES BEAR CHEYENNE FOUNTAIN TOTAL TOTAL TOTAL TOTAL <br /> PEAK- CREEKl ROSEMONT2 CREEKl VALLEY LOCAL USE TRANSMTN. TRANSMTN <br />MONTH NORTHFLD WELLS DELIVERY EXCHANGE &CHEROKEE <br />OCTOBER 967 0 0 310 0 1,277 6,486 1,369 3,840 <br />NOVEMBER 898 0 0 120 0 1,018 5,340 0 4,322 <br />DECEMBER 910 0 0 135 0 1,045 4,351 0 3,306 <br />JANUARY 485 0 0 177 0 662 4,402 1,419 2,321 <br />FEBRUARY 806 0 0 249 0 1,055 4,171 1,244 1,872 <br />MARCH 811 0 0 253 0 1,064 4,464 1,385 2,015 <br />APRIL 1,198 0 0 326 0 1,524 6,758 2,261 2,973 <br />MAY 1,673 0 0 619 0 2,292 11,225 627 8,306 <br />JUNE 2,088 0 0 382 0 2,470 12,448 0 9,978 <br />JULY 2,257 0 0 214 0 2,471 12,888 0 10,417 <br />AUGUST 2,021 0 0 245 0 2,266 11,311 0 9,045 <br />SEPTEMBER 1,700 0 0 203 0 1,903 10,403 0 8,500 <br />TOTALS 15,814 0 0 3,233 0 19,047 94,247 8,305 66,895 <br />1 Bear Creek utilization is currently under study, <br />2 The Rosemont System delivered 988 acre-feet of raw water directly for non-potable uses, primarily irrigation use during the 2000 water year. <br /> <br />