My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP08411
CWCB
>
Water Supply Protection
>
Backfile
>
8001-9000
>
WSP08411
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:48:04 PM
Creation date
10/12/2006 2:58:20 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8543
Description
Closed Basin Division
State
CO
Basin
Rio Grande
Water Division
3
Date
3/1/1976
Author
CWCB
Title
Closed Basin Project
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />(~ <br />GO <br />,....; <br />..OWI <br /> <br />>v) <br /> <br />a reasonable assumption that at least 90 percent of the water users in <br />the San Luis Valley support the project. <br /> <br /><:;J <br /> <br />The substantial support which has always existed for project <br />construction has increased considerably in recent years. This <br />increased support has resulted largely from the unfortunate effects <br />of the pending case of Texas and New Mexico v. Colorado. As a result <br />of this case, the Colorado state Engineer has been forced to curtail <br />water uses in Colorado. This reduction in water diversions has <br />caused severe financial hardships, particularly to well owners who <br />for the most part have junior decrees. The well owners are now <br />attempting to raise approximately one million dollars to purchase <br />surface water rights to replace the junior water being pumped from <br />wells. If the Closed Basin, project were constructed. it would not be <br />necessary for the well owners to bear this heavy financial burden. <br /> <br />considerable additional support for the project by the valley <br />residents came about through the incorporation of numerous safeguards <br />in the authorizing legislation (P.L. 92-514, 86 stat. 964), as follows: <br /> <br />I. No project wells, other than observation wells, shall be <br />permitted to penetrate the aquiclude, or first confining clay layer. <br /> <br />2. Construction of any stage of the project after stage one <br />can be undertaken only with the consent of the Colorado Water Conser- <br />vation Board and the Rio Grande Water Conservation District. <br /> <br />3. There must be incorporated into the project plans a control <br />system of observation wells which must be designed to provide posi- <br />tive identification of any fluctuations in the water table of the <br />area surrounding the project attributable to the operation of the <br />project or any part thereof. <br /> <br />4. The project facilities must be operated in a manner that <br />will not cause the water table available for any irrigation or domes- <br />tic wells in existence prior to the construction of the project to <br />drop more than two feet, and in a manner that will not cause reduction <br />of artesian flows in existence prior to the construction of the <br />project. <br /> <br />5. Construction of the project may not be started until the <br />state of Colorado agrees that it will convey to the United States <br />easements and rights-of-way over lands owned by the state that are <br />needed for project purposes and wildlife refuge areas. Acquisition <br />of privately owned lands, where possible and consistent with the <br />development of the project, shall be restricted to easements and <br />rights-of-way in order to minimize the removal of land from local <br />tax rolls. <br /> <br />-4- <br /> <br />---.J <br />
The URL can be used to link to this page
Your browser does not support the video tag.