My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP08407
CWCB
>
Water Supply Protection
>
Backfile
>
8001-9000
>
WSP08407
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:48:03 PM
Creation date
10/12/2006 2:58:12 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8270.100
Description
Colorado River Basin Water Quality/Salinity -- Misc Water Quality
Basin
Colorado Mainstem
Water Division
5
Date
10/1/1983
Title
Colorado River Water Quality Improvement Program - Big Sandy River Unit - Draft Planning Report/Advance Draft Environmental Impact Statement - October 1983
Water Supply Pro - Doc Type
EIS
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
189
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />. <br /> <br />o <br />w <br />c..o <br />C)1 <br /> <br />. <br /> <br />. <br /> <br />Chapter IV <br /> <br />CONTENTS (Continued) <br /> <br />page~ <br /> <br />Alternatives (continued) <br />The recommended plan (continued) <br />Unit features. . . . . . 52 <br />Collection system . . 52 <br />Collection facilities 52 <br />Conveyance system . 53 <br />Transmission lines. 54 <br />Access roads. . . . 55 <br />Permanent operating facility. 56 <br />Lands and rights-of-way. 56 <br />Water rights . . . . . . . . . . 57 <br />Unit administration. . . . . . . 58 <br />Financial and economic analysis. 58 <br />Construction costs. 58 <br />Operation, maintenance, and replacement 63 <br />Cost effectiveness. . . . . . . . . . 63 <br />Cost allocation and repayment . . . . 65 <br />Conditions precedent to construction. 68 <br />Viable alternatives . . . . 69 <br />Alternative I - Chevron. 71 <br />General description 71 <br />Plan accomplishment . 73 <br />Unit features . . . . 74 <br />Collection system. 74 <br />Collection facilities. 74 <br />Conveyance system. 75 <br />Transmission lines. . 75 <br />Access roads . . . . . 76 <br />Permanent operating facility 76 <br />Lands and rights-of-way 76 <br />Water rights. . . . . . . . . . 76 <br />Unit administration. . . . . . 76 <br />Financial and economic analysis 77 <br />Construction costs . . . . . 77 <br />Operation, maintenance, and replacement. 77 <br />Cost effectiveness . . . . . . 78 <br />Cost allocation and repayment. 78 <br />Alternative 2 - Chevron-Texasgulf. 79 <br />AI~ernative 3. . . . . 81 <br />General description 81 <br />Plan accomplishment 84 <br />Unit features 85 <br />Collection system. 85 <br />Collection facilities. 85 <br />Conveyance system. 85 <br />Transmission lines . . 86 <br />Access roads . . . . . 86 <br />Permanent operating facility 86 <br />Lands and rights-of-way. 87 <br />Water rights . . . . . . . . 87 <br /> <br />ii <br />
The URL can be used to link to this page
Your browser does not support the video tag.