My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP08397
CWCB
>
Water Supply Protection
>
Backfile
>
8001-9000
>
WSP08397
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:48:00 PM
Creation date
10/12/2006 2:58:03 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8276.300
Description
Lower Gunnison Basin Unit - Colorado River Salinity Control Program
State
CO
Basin
Colorado Mainstem
Water Division
4
Date
3/1/1981
Title
Lower Gunnison Basin Unit/ Colorado - Status Report
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />canals, problems are experienced with the lining and very high mainten- <br /> <br />ance costs occur. The OM&R contract will recognize the winter stock <br /> <br />water issue as a management responsibility of the Uncompahgre Valley <br /> <br />Water Users Association and not a project responsibility. <br /> <br />Estimated Costs <br /> <br />Construction costs of the Lower Gunnison Basin Unit are based on <br /> <br />feasibility designs and have been updated to reflect January 1981 <br /> <br />prices. The costs reflect the assumption that winter stock water would <br /> <br />not be conveyed in project-lined canals. A sUDDDary of estimated costs is <br /> <br />presented below: <br /> <br />Construction costs (January 1981 <br />Canal lining and improvement <br />Lateral improvement <br />wildlife plan <br />Total <br /> <br />prices) <br />$63,350,000 <br />68,600,000 <br />4,750,000 <br />136,700,000 <br /> <br />OM&R costs would consist of personnel (salary and wages), electric <br /> <br />power consumption, replacement parts, supplies and materials, equipment <br /> <br />operation, and administrative and general expense. <br /> <br />The estimated annual cost in 1981 for OM&R for the portion of the <br /> <br />irrigation delivery system which would be lined is $570,000, which is the <br /> <br />same as would have been incurred without lining. However, with lining, <br /> <br />future costs are expected to increase at a slower rate than in the past. <br /> <br />An initial one-time investment of $140,000 for new maintenance equipment <br /> <br />for lined canals is included as a part of project capital costs. OM&R <br /> <br />costs will continue to be paid by the existing water users. <br /> <br />Cost-Effectiveness and Repayment <br /> <br />The annual cost for each mg/L of salinity reduction 1n the Colorado <br /> <br />River that would result from construction of the Lower GubhQJbJ3~~n <br /> <br />Unit is estimated at $846,000 based upon an annual equivalent cost of <br /> <br />21 <br />
The URL can be used to link to this page
Your browser does not support the video tag.